My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - SERVERS AND TO REMOVE CITY OF BREA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
03/19/2012
>
25E - SERVERS AND TO REMOVE CITY OF BREA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2012 12:56:43 PM
Creation date
3/15/2012 5:48:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25E
Date
3/19/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GE CO <br />r <br />O <br />-ice <br />Project Scope: <br />A&L <br />FATPOT <br />TECHNOLOGIES <br />This project is a migration from the Keystone CAD2CAD message switch to the <br />FATPOT CADfusion product. This migration will allow for a central interface for all <br />current and future county wide projects as well as allow all participating agencies to <br />operate in the CAD2CAD environment. <br />The project addresses several gaps in the Keystone message switch. These <br />gaps were identified in the county wide AVL project. During the AVL implementation <br />process, it was discovered that the FATPOT CADfusion product does not require a <br />custom or one-off interface for each CAD implementation in the county. The Keystone <br />message switch forces each CAD to write a custom interface to the message switch. <br />This forces each agency to utilize a non standard CAD interface. The project addresses <br />the Costa Mesa CAD issue where the Motorola CAD is written to version 1.0 of the <br />message switch. This version of the switch only supports a single or direct connection to <br />MetroNet. Costa Mesa is currently not part of the overall CAD2CAD infrastructure since <br />they can only communicate to MetroNet and not any other agencies via the message <br />switch. The issue of custom or one off interfaces for each agency is addressed and <br />subsequently corrects the Costa Mesa issue, allowing the entire county to participate in <br />the CAD2CAD infrastructure. The project will have a regional impact by creating a <br />single central interface for not just CAD2CAD, but for other projects, such as the ePCR <br />project hosted by OC Health as well as a possible county wide MUM project. The <br />FATPOT product will also support future projects such as a county wide RMS2RMS <br />project. <br />Scope Of Work: <br />FATPOT Technologies will provide Bi-Directional interfaces for CAD data to <br />Costa Mesa, Laguna Beach, Metronet, Orange County Fire (OCFA), and Santa Ana <br />Fire and link these into existing CADfusionTM installations already in place from the <br />Regional AVL Project. The interfaces to Laguna Beach, Metronet, and Santa Ana are <br />already in place from existing work. FATPOT will migrate these interfaces to a <br />CADfusionTM Server at the Metronet dispatch center and then build out interfaces to <br />Costa Mesa and OCFA. In addition to software licensing, FATPOT will provide <br />professional services in the form of: <br />• Project Management <br />• On-Site Meeting and Coordination <br />• Installation and Configuration of Software <br />• Testing and Documentation of the overall system <br />• Overall project fiscal management <br />• Subcontracting to Intergraph and Keystone for interface work <br />2 <br />25E-6
The URL can be used to link to this page
Your browser does not support the video tag.