Project 1 1 -2605 & 1 1 -2612 <br />Request for Approval of Change Order No. 1 <br />May 22, 2012 <br />Page 2 of 2 <br />2. The contract documents require a new eight station irrigation controller and <br />indicate that six stations are to be used and two are to be spares for future <br />use. The plans show nine new irrigation control valves; therefore the irrigation <br />controller needs to be upgraded to a 12 station controller, which is the next <br />available sized controller. <br />This cost compensates the contractor for the cost of the upgraded controller <br />and equipment necessary for the controller to function properly in the new <br />enclosure and for the cost of the new combination enclosure. The cost also <br />accounts for a credit for deletion of the specified irrigation enclosure_ (PCO 2) <br />AGREED COST = $ 4172 <br />NEW CONTRACT LINE ITEMS <br />The contract documents for the Maple Street Bike Trail indicate an estimated <br />quantity for unclassified excavation of 14 cubic yards with the bid amount at <br />$200 per CY. When grading operations started it was discovered that the <br />actual quantity would be approximately 400 CY_ Due to the increased quantity <br />of dirt that needs to be removed from the site a new line item cost of $29 per <br />CY was negotiated to remove and dispose of the excess dirt. <br />ESTIMATED COST= $ 11,600 <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />it Z 1G � -� .n .Y <br />Ra odinez II xecutive Director Francisco Gutierrez, Executive Director V � <br />Public Works A ncy Finance and Management Services Agency <br />K:\construction\projects \1'I- 2605 \MEM RFA 01 CCO 1 <br />