My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
04/02/2012
>
FULL PACKET_2012-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 2:47:15 PM
Creation date
4/2/2012 10:52:13 AM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
4/2/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />L <br />t <br />project development. The Planning Center's approach to environmental studies combines creath <br />and attention to detail. Our obligations to our clients include the following. <br />Quality. We value our reputation as a Quality firm, providing Quality products and services to 2 <br />highest levels of Quality, The Planning Center exercises Quality control procedures wherein all prc <br />Quality control. See Section 2.5 below for details on these procedures. <br />Professionalism. Our clients deserve high - Quality work — objective, unbiased reporting and impeccable accuracy of detail. <br />Equally important, we strive to stay on the leading edge of our profession. <br />Defensibility. CEQA is constantly changing through court interpretations, statutory amendments and amendments to the <br />guidelines. The Planning Center closely tracks these changes to ensure that its environmental documents are legally adequate. <br />Timely Performance. Criticisms of CEQA are often related to the amount of time needed to satisfy its requirements. We pride <br />ourselves in our ability to apply the resources necessary to satisfy our commitments. The Planning Center has a tremendous <br />amount of resources from which to rely on. We have over 100 employees within our five offices. As a result, we have the ability <br />to pull in additional staff when necessary to maintain very demanding schedules at no additional cost to the City. <br />2.4 Quality Control <br />To ensure the highest level of quality in the documents produced by the firm, we have established a number of procedures that <br />are strictly followed for each project to ensure that all deliverables are free of errors. Each employee, highly skilled in his or her <br />own area of expertise, makes passes through each document at various stages before a document leaves the building, ensuring <br />accuracy and consistency in content and format. Our goal is for each project team to work as a "well -oiled machine" to <br />efficiently provide the best products and services. <br />The chain of Quality control measures is as follows: <br />r. ► The Project Manager (PM) meets with technical (research/writing) staff and graphics staff to make assignments and <br />communicate deadlines. <br />LL <br />► Technical staff work on their portions, remaining in regular contact with PM, who fields any Questions. In this way, the <br />_ PM remains abreast of any issues that may arise and can deal with them in a timely manner. <br />► Graphics staff utilize company graphics templates to ensure consistency between document graphics and text pages. <br />We produce projects in- house, rather than sending out to <br />a service bureau, so that we can ensure an even higher level of quality <br />control, as well as reduced costs to our clients. <br />► The PM folds the various sections together, carefully reviewing, correcting, and refining content and making into one <br />cohesive document. <br />► The PM submits the document to technical editing staff, who look for and correct inconsistencies and grammatical <br />errors and report oversights to the PM. <br />w ► The PM submits the document to word processing (WP) and graphics staff for formatting. WP prints the document for <br />the PM. <br />► The PM reviews the document again and submits to a technical Quality control officer (Principal or Director), who <br />thoroughly reviews the document. <br />liptions to the City of Santa Ana THE PLANNING CENTER Page S <br />25F -24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.