My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
04/02/2012
>
FULL PACKET_2012-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 2:47:15 PM
Creation date
4/2/2012 10:52:13 AM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
4/2/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?.Y <br />► The PM collects Principal's and /or Director's comments and incorporates changes according) <br />► PM submits document to WP and Graphics, who again follow respective Checklists. WP prints <br />PM, and Graphics staff prints graphics. <br />► PM reviews and assembles the text document and graphics, and submits to Production Staff (c <br />► Production Staff thumbs through the document page by page to ensure that all graphics are j <br />place, reporting any errors to PM. Production Staff submits copies to PM. <br />► PM makes the last page -by -page pass through the document. <br />The Planning Center has invested a number of high Quality, high -speed copy machines, including color machines, as well as <br />folding and binding machines. Because we produce our projects in- house, we can ensure a higher level of Quality control and <br />reduced costs to our clients. <br />The Planning Center believes these Quality control procedures ensure the highest Quality and in a most efficient (affordable) <br />manner. <br />to the City of Santa Ma <br />25F -25 <br />THE PLANNING CENTER I Page 6 <br />� X <br />(t" <br />S r_ <br />document for the <br />nng/ .° <br />,inding). <br />ent and in proper <br />The Planning Center has invested a number of high Quality, high -speed copy machines, including color machines, as well as <br />folding and binding machines. Because we produce our projects in- house, we can ensure a higher level of Quality control and <br />reduced costs to our clients. <br />The Planning Center believes these Quality control procedures ensure the highest Quality and in a most efficient (affordable) <br />manner. <br />to the City of Santa Ma <br />25F -25 <br />THE PLANNING CENTER I Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.