My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITERIS INC. 3 -2012
Clerk
>
Contracts / Agreements
>
I
>
ITERIS INC. 3 -2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2012 3:51:50 PM
Creation date
4/12/2012 3:01:01 PM
Metadata
Fields
Template:
Contracts
Company Name
ITERIS INC.
Contract #
N-2012-036
Agency
PUBLIC WORKS
Expiration Date
12/31/2012
Insurance Exp Date
4/1/2013
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Scope of Work for City of Santa Ana Video System Upgrade Support Project- <br />Iteris Scope of Services for <br />City of Santa Ana Video System Upgrade Support Project <br />Background: The City of Santa Ana current/y employs a video system for Traffic Survei/lance and wishes to <br />upgrade the system. Withh the goo! of providing more functionality and improve to an all /P networtc based <br />system. A diagram of the existing system, as provided to lteris by the City, is depicted below for reference. The <br />primary issues and existing conditions, identified by the City, to overoome for the protect are identrfied as <br />to/lows: <br />1. The main issue is providing video and control to the Remote TMC users and to the Senior Engineer's <br />office. <br />2. There are 12 multimode fibers between the Main TMC to the Remote TMC. <br />3. There ore 6 single mode fibers between the Moin TMC to the Remote TMC, with 3 fibers used for <br />current video transceivers and Ethernet connection. <br />4. The distance between the two TMCs is about 900 feet. <br />5. The analog monitors in the TMC will one day be changed to digital ones. <br />6. The future cameras wi!/ be the Cohu He/ios_ <br />7. The ffp server needs snapshots [o be uploaded to it, where it then publishes the images to [he City <br />website. So, the process of coking snapshots at certain intervals and uploaded to the ftp server <br />needs to be addressed. <br /> s.]..c ...d.,o s,?,e.w..._ <br /> <br /> <br />?'1?\I w M? E.NasS i 5 dial Wu „ }? ?„ysy ?? ?r?[I <br />M?f <br />v M]] Kip IIf.Y++?wu. Yl]l IYY; <br />? ,9 rwa. <br />}f ? -. rte... ?. .senc ? <br />d? _ <br />Yoe ww?t?? WJ",-?flq (.tl?? V?E[i !?? 1 ?? u?I? <br /> <br />Meee1 nu?ds 9905!(l•? ? <br /> <br />?. <br />? V <br />? <br />? <br />? ? <br />? ? w. FOw R. 6 V4? <br /> <br />Tr?.nn? <br /> . 1 <br />? <br />Ps?_cAaV 1 <br />?'? ? 1 ? '. 1 <br />?? rte[ <br />[yr?ra 1?0 ??.sl 1 <br />T 1 <br />1 1 <br /> <br />, 1 <br />1 <br /> <br /> <br />? i <br /> <br />?' 1 <br />1 <br />? <br />? <br />1 <br />1 1 <br />1 <br />? If11s <br />Vpai? <br />? <br />1 <br />1 <br />1 UTi?"?q r.re?.e.wa. ? <br />As deFned by the City, the upgraded Video System shall have the following capabi/ides as a minimum: <br />1. A// lP network based system <br />2. A!!ow control and video access from any workstation on the TMC network <br />3. Allow control and video access via remote login <br />4. A//ow snapshot and streaming for external uploads <br />5. A//ow multip/e wall video display for TMC and Remote TMC <br />6. Incorporate and maintain the use of existing Cohu cameras during transition <br />7. Incorporate and maintain the existing analog video system during the transition <br />ITERIS?
The URL can be used to link to this page
Your browser does not support the video tag.