Laserfiche WebLink
Scope of Work for City of Santa Ana Video System Upgrade Support Project- <br />Scope of Work: <br />The primary goal for the project is to provide a Vdeo System Upgrade Plan to the City. Iteris will provide the <br />following scope of services to assist the City in its efforts. The resulting overall deliverable will be a brief, high- <br />level plan in a Technical Memorandum (less than ? O pages) that presents TMC upgrades required to achieve <br />the City's primary goals. The following tasks <br />Task 7.O Conduct Uetai/ed Survey of Existing Systems and Communications Media: <br />Implementing network based video requires a design analysis that begins with a survey of key elemerrts, <br />including: <br />1. Existing TMC video equipment and field camera equipment- <br />2. Existing transceiver, video switch and network based communications. <br />3. Existing TMC LAN network equipment, software and servers that wi/I support the TMC and other <br />users. <br />4. Documentation of the survey results into o Detailed Existing Systems and Communications report <br />section. <br />7.0 Deliverable: Existing Systems and Communications Technical Memorandum Section <br />Task 2.0 Requirements Oefrnition for networ/c, TMC, /P video systems, and Data <br />systems interfaces: <br />It is recommended that high-level user and system requirements be documented specifically for the TMC and <br />other related users. Although the requirements will be high level and focused on the proposed City goals, it is <br />envisioned that the developed requirements should also consist of some "system-wide" requirements to support <br />the e?ansion of network based communications on a City wide level- This effort will include: <br />1. 1-2 meetings with City of Santa personnel to document requirements for the expanded systems. <br />2. Development/document user and system requirements for the network and video systems <br />2.0 Oe/iverab/e. Requirements Definition Technical Memorandum Section <br />Task 3.O High Level Design and Ana/ysis?Recommendation of requiried/availab/e <br />vendor equipment: <br />Based on results of Tasks 1.0 and 2.0, Iteris will review available systems and analyze vendor equipment to <br />recommend for deployment of network and video components supporting the City's goals. This will be used to <br />develop a high level design that the City could use to implement required changes. This effort would include: <br />1. Recommendations of networking equipment. <br />2. Recommendation of video encoding/decoding equipment and software [hot can be used- <br />3. Provide high level design diagram(s) for proposed network and system architecture. <br />4. Phased Upgrade Plon, identifying how best to upgrade and when. <br />5. Rough Order of Magnitude Costs and Proposed Bil! of Materials <br />3.0 Oe/iverab/e: Recommended Equipment and High Level Design Technical Memorandum Section. <br />Taste 4.0 /ntegration and Construction Oversight (Options/) <br />The deployment of network communications and the system integration effort involved may encompass a <br />variety of integration and construction oversight tasks as shown bekwv. It is understood that City staff or <br />subcontractors, which could be Iteris, could be involved in system up9radeldeployment. Iteris is prepared to <br />move fonivard with any activities that the City deems relevant and critical for our involvement on a time and <br />material basis. The following tasks are envisioned: <br />I??2zs