My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-013 - Negative Declaration and Mitigation Monitoring Program, Environmental Review No. 2011-46
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2012
>
2012-013 - Negative Declaration and Mitigation Monitoring Program, Environmental Review No. 2011-46
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2012 11:44:08 AM
Creation date
4/26/2012 11:43:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2012-013
Date
3/19/2012
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. SPR NO. 2012-01 <br />MARCH 5, 2012 <br />PAGE 6OF7 <br />C. Average overall project unit size of 915 s.f. <br />d. Minimum 255 s.f. per unit of open space. <br />e. Maximum 257 tandem parking stalls (42%) <br />f. Addition of the following amenities: yoga <br />game lounge and pet-park. <br />g. Minimum 1,900 s.f. fitness center. <br />h. Minimum 1,625 s.f. pool. <br />veranda, business center, <br />Minimum 17,647 s.f. rooftop lounge amenity area. <br />34. Project and amenities shall be consistent in quality, detail and finishes with <br />all graphics, exhibits and other representations submitted by the applicant. <br />B. Police Department <br />The elevator lobby shall be redesigned by removing the elevator alcove and <br />providing a secure lobby enclosed with fire rated glass partitions. <br />2. A security plan must be submitted to the Police Department at the plan <br />• check stage for approval. The plan must cover all aspects of the projects <br />security including security personnel, surveillance/camera equipment (on <br />each floor of parking structure, stairwells, and elevator lobby/cab) with <br />internet viewing capability for the tenants of the project, and access control <br />hardware. The project will be required to have a minimum of two state <br />licensed uniformed security personnel. One security officer will be required <br />for the residential buildings and one for the parking garage. Entrances/exits <br />to the parking structure must be equipped with rolling overhead gates. <br />3. A security plan must be submitted to the Police Department at the plan <br />check stage for approval. The plan must cover all aspects of the projects <br />security including security personnel, surveillance/camera equipment (on <br />each floor of parking structure, stairwells, and elevator lobby/cab) with <br />internet viewing capability for the tenants of the project, and access control <br />hardware. The project will be required to have a minimum of two state <br />licensed uniformed security personnel. One security officer will be required <br />for the residential buildings and one for the parking garage. Entrances/exits <br />to the parking structure must be equipped with rolling overhead gates. <br />Redesign Elevator lobby - Remove elevator alcove and provide a secure <br />lobby enclosed with fire rated glass partitions. A minimum 12-inch <br />shatterproof convex mirror shall be installed at each stair landing. All doors <br />leading into stairwells shall be equipped with a minimum 5-inch by 20-inch <br />fire rated window. The last flight of stairs shall be fully enclosed at its base. <br />• Duress alarms allowing voice communication with security personnel shall <br />EXHIBIT "B"
The URL can be used to link to this page
Your browser does not support the video tag.