My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEST COAST STORM, INC. - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
WEST COAST STORM, INC. - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:57:46 PM
Creation date
5/17/2012 3:15:32 PM
Metadata
Fields
Template:
Contracts
Company Name
WEST COAST STORM, INC.
Contract #
A-2011-254
Agency
PUBLIC WORKS
Council Approval Date
11/28/2011
Expiration Date
6/30/2012
Insurance Exp Date
1/20/2013
Destruction Year
2022
Notes
Amended by A-2011-254-01
Document Relationships
WEST COAST STORM, INC. 1A - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� <br />West Coast Storm,Inc. <br />Storm if'ater• and Envit•onn:ental Sohrtions <br />County of Orange, OC Public Works <br />Automatic Retractable Screen Excluders, Connector Pipe Screen Full Capture Trash <br />Systems, and Catch Basin Inserts <br />RFP# 080-591792 <br />West Coast Storm Screen <br />Automatic Retractable Screen <br />Equipment Design and Specification Report <br />(Information provided to the City as requested in the RFQ documents under <br />Attachment A. Scope of Work) <br />Regulatory Permits Required for Installation. Confined space entry permitting is required <br />on all drain installations. 40 -hour HAZWOPER training is required for storm drain entry. <br />Maintenance Requirements. Preventative Maintenance of regular street sweeping will <br />prevent debris from building up in front of the unit. <br />Suggested Yearly Maintenance. Inspections consist of visually inspecting the unit from <br />street level and performing an opening -lock function check. <br />Visual Inspection: <br />1. Clean away any built-up debris and foreign object debris. Remove any visible debris <br />that may be on, in front of, and nearby the unit. <br />2. Look for any visible signs of vandalism or damage that may compromise the unit's <br />ability to properly function. Attempted vandalism and slight damage should be <br />inspected closely to ensure no future damage may result. <br />Opening -Lock Function Check: <br />1. Using a pen or screwdriver, insert it through the perforated openings at the center of <br />the main screen in order to make contact with the sail (locking mechanism). <br />2. Push forward until the screen unlocks and hinges open. <br />3. Place your opposite hand against the screen so it does not close, slowly remove the <br />pen or screwdriver from hole. <br />4. Slowly guide the screen down just before it locks, remove your hand letting the <br />weight of the screen lock itself. <br />5. If the unit is not opening and closing to the standard in which it was installed and the <br />unit is not hindered by debris or F.O.D. (foreign object debris) then the unit may be <br />damaged and replacement may be necessary. Contact West Coast Storm, Inc. for <br />further assistance. <br />Page 35 of 45 <br />654 South Lincoln Avenue, San Bernardino, CA 92408 — Telephone 909.890.5700 Facsimile 909.890.5988 <br />California General A/HAZ Contractor License Number: 888152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.