My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEST COAST STORM, INC. - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
WEST COAST STORM, INC. - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:57:46 PM
Creation date
5/17/2012 3:15:32 PM
Metadata
Fields
Template:
Contracts
Company Name
WEST COAST STORM, INC.
Contract #
A-2011-254
Agency
PUBLIC WORKS
Council Approval Date
11/28/2011
Expiration Date
6/30/2012
Insurance Exp Date
1/20/2013
Destruction Year
2022
Notes
Amended by A-2011-254-01
Document Relationships
WEST COAST STORM, INC. 1A - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Coast Storin,Ilie. <br />Storm Water and Lnviromnental Solutions <br />County of Orange, OC Public Works <br />Automatic Retractable Screen Excluders, Connector Pipe Screen Full Capture Trash <br />Systems, and Catch Basin Inserts <br />RFP# 0$0-591792 <br />West Coast Storm Screen <br />Automatic Retractable Screen <br />Equipment Design and Specification Report <br />(Information provided to the City as requested in the RFQ documents under <br />Attachment A. Scope of Work) <br />6. Place a level on the front end (85-001), and verify the unit is vertically level. Upon <br />adjustment of the unit to vertical level position, ensure positioning is 1 -inch horizontally <br />from center of front screen to curb batter line. <br />7. Once the unit is level and proper positioning is verified, the technician will secure the <br />unit for installation. <br />8. Slide the mounting brackets (85-009) up and/or down until they meet the wall face. <br />9. Tighten the 3/8-16 hex nuts to the ARS unit utilizing Loctite Red (thread locker). <br />10. Utilizing the Hammer Drill, drill two 3/8 -inch pilot holes into the concrete. Drill the two <br />holes a minimum of 6 inches apart in the sidewalls. <br />11. Hammer the 3/8 -inch drop anchor SS sleeve as straight as possible until it is imbedded a <br />minimum of 3 -inches into the wall. <br />12. Place the standard washer and 3/8-16 nuts onto the 3/8 -inch concrete drop anchor. Drill <br />the two holes a minimum of 6 inches apart in the sidewalls. <br />13. Use a 14mm open-end wrench or socket ratchet and tighten until secure. Utilize Loctite <br />Red (thread locker) before securing. <br />Site-specific Measurements Required. <br />West Coast Storm, Inc. requires minimum information prior to measuring, only drain <br />location. In the even there is not clear data on drain locations, we can locate them upon <br />municipality approval. Information provided to municipalities will include GPS coordinates, <br />address, as well as catch basin measurements. We can and will work with municipal staff to <br />acquire the proper information needed to import into a GIS mapping layer database. <br />Equipped with an industry leading ACCESS database helps us export the information to <br />create GIS mapping layers. <br />Page 34 of 45 <br />654 South Lincoln Avenue, San Bernardino, CA 92408 — Telephone 909.890.5700 Facsimile 909.890.5988 <br />California General AMAZ Contractor License Number: 888152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.