My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEST COAST STORM, INC. - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
WEST COAST STORM, INC. - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:57:46 PM
Creation date
5/17/2012 3:15:32 PM
Metadata
Fields
Template:
Contracts
Company Name
WEST COAST STORM, INC.
Contract #
A-2011-254
Agency
PUBLIC WORKS
Council Approval Date
11/28/2011
Expiration Date
6/30/2012
Insurance Exp Date
1/20/2013
Destruction Year
2022
Notes
Amended by A-2011-254-01
Document Relationships
WEST COAST STORM, INC. 1A - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CL <br />vV'3. <br />West Coast Storm,Inc. <br />Storni Water and Environmental Solutions <br />County of Orange, OC Public Works <br />Automatic Retractable Screen Excluders, Connector Pipe Screen Full Capture Trash <br />Systems, and Catch Basin Inserts <br />RFP# 080-591792 <br />West Coast Storm Screen <br />Automatic Retractable Screen <br />Equipment Design and Specification Report <br />(Information provided to the City as requested in the RFQ documents under <br />Attachment A. Scope of Work) <br />West Coast Storm, Inc. (WCS) has extensive experience in projects similar to that called for <br />by present RFP. WCS has worked with public and private entities. All operations for the <br />measuring, manufacturing and installation of the products are handled solely by WCS, no <br />subcontractors are needed. Experience in municipal ARS &CPS projects includes finding <br />drain locations, measuring and compiling reports to municipalities on the status of drains <br />measured, upon release of the measured drains by the municipality (Purchase Order) <br />manufacturing operations begin as soon as measurements are released by WCS, shipments <br />are sent daily from Santa Ana to install crews, meeting sites are coordinated by Project <br />Managers to best accommodate installation areas, installations are performed with proper <br />traffic control measures and confined space entry protocol, real-time dispatch reporting from <br />field to WCS office upon completion of each drain, daily reports are comprised and sent to <br />the municipality upon QC, direct contact liaison relationships are established between project <br />managers, office personnel, and municipalities. Handling the job from beginning to finish <br />had proven to clients we are a simple, effective, and efficient way to do business. <br />Similar product installations of Connector Pipe Screen and/or Automatic Retractable Screen <br />projects include the County of Los Angeles, City of Rancho Palos Verdes, City of Anaheim, <br />City of Beverly Hills, City of San Bernardino, City of Perris, City of Burlingame, City of <br />Oceanside, City of Pico Rivera, City of Torrance, City of Fort Worth, Texas, Richland <br />County (South Carolina); the State of Florida Department of Transportation and many others. <br />Page 38 of 45 <br />654 South Lincoln Avenue, San Bernardino, CA 92408 — Telephone 909.890.5700 Facsimile 909.890.5988 <br />California General A/HAZ Contractor License Number: 888152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.