My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEST COAST STORM, INC. - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
WEST COAST STORM, INC. - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:57:46 PM
Creation date
5/17/2012 3:15:32 PM
Metadata
Fields
Template:
Contracts
Company Name
WEST COAST STORM, INC.
Contract #
A-2011-254
Agency
PUBLIC WORKS
Council Approval Date
11/28/2011
Expiration Date
6/30/2012
Insurance Exp Date
1/20/2013
Destruction Year
2022
Notes
Amended by A-2011-254-01
Document Relationships
WEST COAST STORM, INC. 1A - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RWic-stoast Ston-m1ne, <br />Storm Water and Environmental Sohrtions <br />County of Orange, OC Public Works <br />Automatic Retractable Screen Excluders, Connector Pipe Screen Full Capture Trash <br />Systems, and Catch Basin Inserts <br />RFP# 080-591.792 <br />West Coast Storm Connector Pipe Screen <br />Equipment Design and Specification Report <br />(Information provided to the City as requested in the RFQ documents under <br />Attachment A. Scope of Work) <br />A. Description/Design/Engineering, The West Coast Storm -Connector Pipe Screen (CPS) <br />Device meets the full trash capture definition set forth by the Los Angeles Regional Water <br />Quality Control Board. West Coast Storm, Inc. (WCS) has successfully performed three <br />County of Los Angeles contracts requiring Connector Pipe Screen (CPS) installations. All <br />CPS devices were fabricated and installed per the Los Angeles Regional Water Quality <br />Control Board approved specifications for the County of Los Angeles Connector Pipe Screen <br />Device Full Capture System. See Certifications at the end of this section. <br />Additionally, the West Coast Storm Connector Pipe Screen is San Francisco Bay Water <br />Board Certified Device for full capture. See Certifications at the end of this section. <br />Description and Design Elements. <br />General, The CPS prevents trash and debris from entering the storm drain lateral system by <br />keeping the trash and debris inside the catch basin. <br />West Coast Storm CPS Design. The CPS device is designed to retain all trash larger than <br />5 mm in the catch basin, thereby meeting the Regional Water Quality Control Board's <br />definition of full capture in both Los Angeles and San Francisco Regions. <br />1) The CPS is designed and installed to maximize the trash capture volume of the catch <br />basin. <br />2) The CPS bypass accommodates the catch basin design capacity if the screen becomes <br />clogged. <br />3) The CPS does not interfere with the operation of the West Coast Storm Screen ARS <br />devices. <br />4) The CPS is designed with a structural integrity to withstand a force of standing water <br />(62.41b/ft) within the catch basin area if the screen is 100% clogged. <br />5) The center horizontal brace further secures the screen to the frame and add additional <br />strength against severe water force. <br />6) The CPS is designed with a structural frame built to withstand a significant amount of <br />force. The 5mm mesh is secured to the framework further enhancing the structural <br />integrity of the unit. <br />Page 2 of 41 <br />654 South Lincoln Avenue, San Bernardino, CA 92408 — Telephone 909.890.5700 Facsimile 909.890.5988 <br />California General A/HAZ Contractor License Number: 888152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.