My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEST COAST STORM, INC. - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
WEST COAST STORM, INC. - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:57:46 PM
Creation date
5/17/2012 3:15:32 PM
Metadata
Fields
Template:
Contracts
Company Name
WEST COAST STORM, INC.
Contract #
A-2011-254
Agency
PUBLIC WORKS
Council Approval Date
11/28/2011
Expiration Date
6/30/2012
Insurance Exp Date
1/20/2013
Destruction Year
2022
Notes
Amended by A-2011-254-01
Document Relationships
WEST COAST STORM, INC. 1A - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� <br />WGst Coast Stol'nl,i nc. <br />Storm Mater and Envirornnental Solutions <br />County of Orange, OC Public Works <br />Automatic Retractable Screen Excluders, Connector Pipe Screen Full Capture Trash <br />Systems, and Catch Basin Inserts <br />RFP# 080-591792 <br />West Coast Storm Connector Pipe Screen <br />Equipment Design and Specification Report <br />(Information provided to the City as requested in the RFQ documents under <br />Attachment A. Scope of Work) <br />Estimated design life of equipment. Minimum 25 years. <br />B. Performance Effectiveness for Connector Pipe Screens and Catch Basin Inserts. <br />Performance. The purpose of the Connector Pipe Screen is designed to retain all trash larger <br />than 5mm in the catch basin, it prevents hash and debris from entering the storm drain lateral <br />keeping the trash inside the catch basin. When trash is prevented from entering the lateral <br />system a reduction in clogged and standing trash and debris within drain laterals result. Trash <br />reduction meets requirements approved by the County of Los Angeles Regional Water <br />Quality Control Board. Capturing trash and enabling water flow keeps the storm drain system <br />operating at its engineered design capacity. <br />Trash Capture. Capacity is determined by the dimensions of the catch basin, which is <br />utilized as the receptacle to hold trash captured. For example, a three and a half foot catch <br />basin "V -depth" will hold an eighteen inch tall screened device with a 6 inch bypass. The <br />device is designed to capture trash up to the device's bypass within the catch basin. <br />Page 19 of 41 <br />654 South Lincoln Avenue, San Bernardino, CA 92408 — Telephone 909.890.5700 Facsimile 909.890.5988 <br />California General A/HAZ Contractor License Number: 888152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.