<br /> <br /> <br /> <br /> <br /> Post Project Job Evaluation involves General Manager's post project meeting with project <br /> <br /> managers, and if necessary with field crew as well. General Manager will often consult with <br /> <br /> regulatory agencies for their input on performance and improvement suggestions. <br /> <br /> <br /> <br /> For the budget control system on large projects, we use EV (Earned Value) system to monitor <br /> <br /> costs and schedules. Concept is "Actual + ETC = EAU and our billing department would <br /> <br /> update the Actuals daily and project manager updates ETC. By looking at our scheduling to see <br /> <br /> what our EV % Completed and compare this with our schedule and budget to determine the <br /> <br /> schedule under/overrun, as well as cost under/overrun. We understand that our customers do not <br /> <br /> like surprises, so if there is any expected cost or schedule <br /> <br /> <br /> <br /> (5 Identify an special issues and how to address them. <br /> <br /> <br /> <br /> 1. Localized Flood due to plugged storm line or catch basis: <br /> <br /> There have been major incidents where ARS has failed and caused a major flooding during rain. <br /> <br /> In fact, all the ARS were removed from the Los Angeles County Public Works system and <br /> <br /> replaced with giant tube socks like items connected to the outfall. These are in cages so when <br /> <br /> socks break off due to heavy rain pressure, it says in the cage and does not plug up any drain <br /> <br /> system. <br /> <br /> <br /> <br /> In case of flooding, Ocean Blue will dispatch our jetters and guzzlers to unplug the lines. Ocean <br /> Blue will also dispatch out vacuum trucks and pumps if needed. <br /> <br /> <br /> <br /> <br /> <br /> 7 <br /> <br /> 25D-43 <br />