My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - PARKING MANAGEMENT PLAN SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
08/06/2012
>
25E - AGMT - PARKING MANAGEMENT PLAN SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 1:53:58 PM
Creation date
8/2/2012 4:11:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
8/6/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLLEEN HSIEH <br />Profile <br />Transportation Planner <br />EDUCATION <br />B.A. (Environmental Analysis and <br />Ms. Hsieh is a Transportation Planner at IBI Group with over four years of experience in <br />Design), University of California, Irvine, <br />transportation planning and traffic engineering. Ms. Hsieh has performed route planning, <br />2007 <br />corridor analysis, and needs assessment for transportation projects in California. Her <br />experience in transportation planning includes traffic impact and parking studies for a <br />EXPERIENCE <br />variety of development projects and land uses. Ms. Hsieh has an extensive understanding <br />2007 - to date <br />of parking standards, best practices, policy, and management strategies through the <br />IBI Group, Irvine, CA, Transportation <br />various parking studies she has worked on, ranging from regional multi -modal <br />Planner <br />transportation studies, transit station master plan studies, and transit - oriented development <br />(TOD) studies. <br />Representative Experience <br />Metrolink Station Parking Management Study (2009 -2011) - The Metrolink Station <br />Parking Management Study is a comprehensive study of parking management strategies at <br />11 Metrolink stations in Orange County. Commissioned by OCTA, IBI Group is leading the <br />effort in identifying parking management strategies for the planned Metrolink service <br />expansion program. The study involves profiling at each station, public outreach surveys, <br />compilation of national and regional case studies, and coordination with each station city. <br />Ms. Hsieh researched and prepared case studies of best practices in Southern California <br />and North America, conducted an inventory of parking supply and utilization at each <br />Metrolink stations, and developed recommendations for the near and long -term range. <br />Downtown Garden Grove Parking Utilization Study (2010 -2011) - Ms. Hsieh prepared a <br />parking utilization study for downtown Garden Grove. Downtown Garden Grove is centered <br />around Main Street, and is served by nine parking lots. Main Street is a historic area in the <br />City of Garden Grove with a mixture of retail, commercial, and residential uses. The <br />purpose of the study was to determine whether sufficient parking spaces in the immediate <br />area were available to meet the parking demand of the Main Street area. Ms. Hsieh <br />determined accumulation, occupancy, peak demand, and turnover for data collected in <br />parking surveys at the nine study area parking lots. <br />Santa Ana Regional Transportation Center Master Plan (2010) - On behalf of the City of <br />Santa Ana, IBI Group is developing a station master plan for the Santa Ana Regional <br />Transportation Center. The purpose of the study is develop and identify concepts to update <br />SARTC to better connect with the surrounding community and handle the significant <br />increase in passenger levels and transportation modes that will access the station in the <br />next 30 years. Ms. Hsieh is assisting in the parking demand analysis effort for this study by <br />reviewing existing parking standards and rates, quantifying future parking demand for the <br />station based on potential land use development, and identifying strategies for either <br />accommodating this demand with additional parking or developing parking management <br />strategies to help reduce future demand. <br />Anaheim Canyon Metrolink Station Project Study Report (2009) - Ms. Hsieh prepared a <br />parking demand study for the proposed expansion of the Anaheim Canyon Metrolink <br />station. Parking demand at the station is currently exceeding available supply and the spill- <br />over parking demand is impacting an adjacent office development. As the station is <br />improved and commuter rail service expanded at the station, parking demand is forecast to <br />further increase. The parking demand study identifies the potential future demand for <br />parking at the station and identifies potential alternatives to provide sufficient parking for <br />each project phase, during construction, and at project completion. <br />TDT <br />GROITP <br />www.ibi�raup.con <br />City of Santa Ana <br />N0.12 -043 Parking Management Plan at the Santa Ana Regional Transportation Center IBI Group 6.11.12 12 <br />25E -31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.