Laserfiche WebLink
City of Santa Ana Environmental Checklist <br />Consistency <br />Goal, Objective, or Policy <br />Consistency Discussion <br />Determination <br />location with the surrounding community <br />with the approval of a CUP to allow for child <br />care facilities, trade and professional <br />schools, gymnasiums, and recreational uses; <br />and approval of a variance for the increase <br />in building height. In addition, the project <br />will be separated, and thereby protected, <br />from adjacent uses by the existing 6 -foot <br />high wall and the landscaping that would be <br />installed with the project. Thus, the project <br />is consistent with this policy. <br />Policy 5.4 - Support land <br />The project would result in the <br />Consistent <br />uses which are consistent <br />development of residential charter high <br />with the Land Use Plan of <br />school. The project site is designated as <br />the Land Use Element. <br />Professional /Administrative Office by the <br />Land Use Element of the Santa Ana General <br />Plan. Under this designation, the residential <br />school use is appropriate with approval of a <br />CUP. Therefore, the project will support <br />land uses that are consistent with the Land <br />Use Plan of the Land Use Element: <br />Policy 5.5 - Encourage <br />See consistency determination for Policy <br />Consistent <br />development which is <br />2.10 and Policy 3.5 of the Land Use Element, <br />compatible with, and <br />above. <br />supportive of surrounding <br />land uses. <br />Policy 5.11- Encourage <br />The proposed project would result in a <br />Consistent <br />development which does not <br />residential charter high school <br />generate obnoxious fumes, <br />development, and no commercial or <br />toxins, or hazardous <br />industrial land uses are proposed. The <br />materials. <br />proposed school would not generate fumes, <br />toxins, or hazardous materials beyond <br />typical school and residential uses. During <br />construction, activities would involve the <br />use of typical construction related <br />hazardous materials such as paints, <br />solvents, oils, grease, and caulking. These <br />types of materials are not acutely <br />hazardous, and all storage, handling, use, <br />and disposal of these materials are <br />regulated by federal and state regulations, <br />which construction activities are required <br />to comply with. Therefore, the project <br />would be consistent with this policy. <br />Public Safety Element <br />Policy - Assure minimum <br />The proposed project is located about 1.8 miles <br />Consistent <br />feasible response time to <br />from Fire Station #1, which would first respond <br />fire calls in all areas of the <br />to the site in the event of a fire emergency. <br />City. Strictly enforce <br />Additionally, the site is approximately 2.4 miles <br />safety provisions of <br />from Fire Station #8. The hire Department <br />building and zoning codes. <br />estimates that response times to the site are 5 <br />The Academy Charter High School <br />3 -66 <br />June ne 2012 <br />Initial Study /Mitigated Negative Declaration <br />2012 <br />icr <br />31 B -142 <br />