Laserfiche WebLink
City of Santa Ana <br />Environmental Checklist <br />Consistency <br />Goal, Objective, or Policy Consistency Discussion Determination <br />minutes or less, which is considered adequate <br />by the fire department. Furthermore, the fire <br />department requires the proposed project to <br />meet all access, water, and fire protection <br />systems per the California Building Code and <br />Fire Code, as well as all other applicable City <br />Municipal Codes. Due to coordination with the <br />fire department, the existing response times <br />from Stations #1 and #8 to the project site, as <br />well as the enforcement of building code <br />requirements, the project is consistent with this <br />policy. <br />Seisinic Safety Element <br />The project would include modern architectural Consistent <br />Goal 1- Provide a safe <br />As discussed in Sections Vi of this document Consistent <br />environment for all Santa <br />(Geology and Soils), the proposed project will be <br />Ana residents and <br />designed and approved in consistency with the <br />workers. <br />California Building Code and site - specific design <br />finishes, and construction. <br />recommendations within the geotechnical <br />Policy 1.4 - Development <br />investigation. The approval process, by the City <br />and other design features <br />of Santa Ana Planning and Building Agency <br />that prevent loitering, <br />includes confirmation that the proposed <br />vandalism, graffiti, and <br />development fully complies with the California <br />visual deprivation are to <br />Building Code. Other potential safety concerns <br />are addressed throughout this document, and <br />sufficient mitigation measures are provided to <br />ensure that no significant impacts occur as a <br />result of the proposed project. As such, the <br />project would provide a safe environment for all <br />Santa Ana residents and workers, and the <br />project would be consistent with this goal. <br />Objective 1.3 - Minimize <br />Pursuant to requirements of the California Consistent <br />seismic risk in the <br />Building Code, the City of Santa Ana, and <br />construction of new <br />Mitigation Measure GEO -1, the project would <br />structures. <br />incorporate appropriate design measures to <br />minimize the seismic risk related to seismic <br />movement. The incorporation of measures <br />pursuant to these requirements would minimize <br />seismic risk. The project would be consistent <br />with this policy. <br />Urban Design Element <br />Policy 1.1- New <br />The project would include modern architectural Consistent <br />development and <br />elements that represent the highest quality <br />redevelopment projects <br />design, materials, finishes, and construction, <br />must have the highest <br />consistent with this policy. See consistency <br />quality design, materials, <br />determination for Policy 2.10 and Policy 3.5 of <br />finishes, and construction. <br />the Land Use Element, above. <br />Policy 1.4 - Development <br />The project would be required to submit a Consistent <br />and other design features <br />Security Plan to the Santa Ana Police <br />that prevent loitering, <br />Department for approval and to comply with the <br />vandalism, graffiti, and <br />CPTED principles to the satisfaction of the police <br />visual deprivation are to <br />department. In addition, the project site would <br />The Academy Charter High School 67 June 2012 <br />Initial Study /Mitigated Negative Declaration ICF00914.11 <br />'kil:5 I <br />