My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31B - CUP - 1901 NORTH FAIRVIEW ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
09/04/2012
>
31B - CUP - 1901 NORTH FAIRVIEW ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 1:46:24 PM
Creation date
8/30/2012 12:38:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31B
Date
9/4/2012
Destruction Year
2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Environmental Checklist <br />Furthermore, the proposed project would employ approximately 72 staff at full operational capacity <br />of Phase II. Key personnel include 41 educational staff for Phase 1, 7 additional education staff for <br />Phase 11,15 non - education staff, and 9 residential program staff to provide 24 -hour supervision in <br />the residences. Additionally, the proposed project would hire a local security company to perform <br />periodic nighttime patrols and monitor the onsite security system. Because the unemployment rate <br />within Orange County is substantial -9.0% in December 2010 and 7.8% in December 20116 — <br />employees are expected to come from the surrounding community. The need for employees to be <br />relocated from distant areas is not anticipated. Therefore, the project would not necessitate the need <br />for construction of new housing or result in inducing substantial population growth. Furthermore, <br />the proposed project would be constructed on a vacant lot surrounded by existing development and <br />served by existing infrastructure. No roads or infrastructure would be extended to serve the <br />proposed project. As such, impacts would not be considered substantially growth - inducing either <br />directly or indirectly, and impacts are less than significant. <br />b. Displace substantial numbers of existing housing, necessitating the construction of <br />replacement housing elsewhere? <br />No Impact. The proposed project is located on a vacant lot void of any existing development. As <br />such, the proposed project would not displace any existing housing and would not result in the <br />construction of replacement housing elsewhere. No impact would occur. <br />c. Displace substantial numbers of people, necessitating the construction of replacement housing <br />elsewhere? <br />No Impact. As stated in XIII.b, the proposed project would not displace existing housing. The <br />proposed project would not displace any people and would not require the construction of <br />replacement housing elsewhere. No impact would occur. <br />6 Source: State of California Employment Development Department, January 20, 2012. <br />http://www.calmis.ca.gov/file/ifmontli/oran$pds.pdf <br />The Academy Charter High School June 2012 <br />Initial Study /Mitigated Negative Declaration 3 -83 <br />1CF00914.11 <br />31 B -161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.