DETAILED PRICING - EXHIBIT B
<br />REQUEST FOR PROPOSALS LEASE - LEASEBACK SERVICES PAGE 1
<br />Description Total Classroom Community Total
<br /> Building &Site Center&Site Combined
<br />Division 1 -General Requirements
<br /> Project Manager $ 60,480 $ 60,480 $ 120,960
<br /> Project Superintendent $ 65,520
<br />$ 65,520
<br />$ 131,040
<br /> Clerical $ 15,960
<br />$ 15,960
<br />$ 31,920
<br /> Safety Officer/Coordinator $ 13,798 $ 5,939 $ 19,737
<br /> Vehicles $ 7,650 $ 7,650 $ 15,300
<br /> Trailer $ 4,950
<br />$ 4,950
<br />$ 9,900
<br /> Communications $ 3,575 $ 3,575 $ 7,150
<br /> Office equipment/Supplies $ 3,505 $ 3,505 $ 7,010
<br /> Small Tools & Equipment $ 3,360
<br />$ 3,360
<br />$ 6,720
<br /> Temporary Utilities INC INC INC
<br /> Site Cleaning $ 500
<br />$ 500
<br />$ 1,000
<br /> Toilets $ 3,300
<br />$ 3,300
<br />$ 6,600
<br /> Mobilization/Layout (no more than 1%) INC
<br />INC
<br />INC
<br /> Job Signage $ 625 $ 625 $ 1,250
<br /> Fencing/Barricades $ 4,250 $ 4,250 $ 8,500
<br /> SWPPP Compliance $ 5,400 $ 5,400 $ 10,800
<br /> Waste Disposal $ 10,000
<br />$ 10,000
<br />.
<br />$ 20,000
<br /> Plans & Specifications reproduction $ 1,250 $ 1,250 $ 2,500
<br /> Data Processing $ 28,362 $ 12,207 $ 40,569
<br /> Submittals, Shop Drawings (no more than 3%) INC INC INC
<br /> Close-out Documentation (not less than 4%) INC INC INC
<br /> Testing By Owner By Owner By Owner
<br /> Final Clean $ 25,200 $ 12,240 $ 37,440
<br /> Site Cleanup $ 688 $ 688 $ 1,376
<br /> Miscellaneous $ 1,100 $ 1,100 $ 2,200
<br /> Subtotal: $ 259,473 $ 222,499 $ 481,972
<br />
<br />Division 2 -Existin g Conditions
<br /> Survey $ 9,600 $ 6,400 $ 16,000
<br /> Other NA NA NA
<br />
<br />Division 3 -Concrete
<br /> Building Concrete Reinforcing $ 220,680 $ 98,000 $ 318,680
<br /> Site Concrete Reinforcing INC INC INC
<br /> Cast In Place Concrete (Building & Site) $ 845,000 $ 335,000 $ 1,180,000
<br /> Concrete Topping INC INC INC
<br /> Other NA NA NA
<br />
<br />Division 4 -Mason
<br /> CMU $ 108,300 $ 133,100 $ 241,400
<br />1 CMU Veneer
<br />S INC INC INC
<br /> CMU Reinforcing INC INC INC
<br /> Precast Wall Cap INC NA INC
<br />
<br />Division 5 -Metals
<br /> Structural Steel $ 1,326,166 $ 495,397 $ 1,821,563
<br /> Metal Deck $ 102,500 $ 46,948 $ 149,448
<br /> Structural Metal Studs (with Framing in Div 9) INC INC INC
<br /> Metal Fabrications INC INC INC
<br /> Fences & Gates INC INC INC
<br />
<br />Division 6 -Wood and Plastics
<br /> Misc. Rough Carpentry $ 18,950 $ 7,900 . $ 26,850
<br /> Casework $ 64,500 $ 16,780 $ 81,280
<br />
<br />Division 7 -Thermal and Moisture Protection
<br /> Sheet Waterproofing $ 8,778 $ 14,350 $ 23,128
<br /> Thermal Acoustical Insulation $ 17,699 $ 8,662 $ 26,361
<br /> Thermoplastic Membrane Roofing $ 131,850 $ 66,000 $ 197,850
<br /> Flashing & Sheet Metal $ 53,747 $ 18,102 $ 71,849
<br /> Roof Accessories INC INC INC
<br /> Cementitious Fireproofing INC INC INC
<br /> Fire stopping/Expansion Joint $ 12,379 $ 21,633 $ 34,012
<br />
<br />Division 8 -Doors and Windows
<br /> Doors/Frames/Hardware $ 91,900 $ 55,000 $ 146,900
<br /> Coiling Doors $ 14,000 $ 14,000 $ 28,000
<br /> Windows/Glazing $ 77,961 $ 63,751 $ 141,712
<br /> Access Doors $ 1,000 $ 800 $ 1,800
<br />
<br />Division 9 -Finishes
<br /> Portland Cement Plaster INC INC INC
<br /> Gypsum Board Assemblies $ 1,003,000 $ 371,000 $ 1,374,000
<br /> Metal Stud Framing INC INC INC
<br /> Acoustical Ceiling $ 65,000 $ 22,500 $ 87,500
<br /> Ceramic Tile $ 51,882 $ 31,260 $ 83,142
<br /> Flooring S 43,675
<br />$ 26,905
<br />$ 70,580
<br />SANTA ANA OINIFIEDSCHOOLDISTRICT-GARFIELD ELEMENTARY SCHOOL Barour 25H-1 6 ConstructioBum