Laserfiche WebLink
DETAILED PRICING - EXHIBIT B <br />Dew ion Total Classroom Community Total <br /> Buildin &Site Center &Site Combined <br /> Painting $ 64,800 <br />$ 25,895 <br />$ 90,695 <br /> Slab Moisture Control / Slab Sealer $ 47,685 $ 23,250 $ 70,935 <br /> <br />Division 10-Speci alties <br /> Toilet Partitions & Accessories $ 19,482 $ 14,936 $ 34,418 <br /> Signage $ 11,450 $ 7,033 $ 18,483 <br /> Operable Partitions NA $ 9,336 $ 9,336 <br /> Flag Pole $ 9,336 NA <br />$ 9,336 <br /> Fire Protection Specialties $ 2,012 $ 2,198 $ 4,210 <br /> Visual Display Boards $ 20,455 NA <br />$ 20,455 <br /> <br />Division 11-Equip ment <br /> Exterior Court Athletic Equipment $ 117,081 NA $ 117,081 <br /> Other NA NA NA <br /> <br />Division 12 -Furni shings <br /> Roller Shades $ 11,590 <br />$ 4,360 <br />$ 15,950 <br /> Other NA NA NA <br /> <br />Division 13-Special Construction <br /> <br />Division 14-Conveying Systems <br /> Elevator $ 82,221 $ 82,221 $ 164,442 <br /> <br />Division 21-Fire Suppression <br /> Fire Sprinklers $ 59,700 <br />$ 28,650 <br />$ 881350 <br /> <br />Division 22 -Plum bing <br /> Plumbing fixtures and equipment $ 260,000 $ 194,300 $ 454,300 <br /> <br /> <br /> <br />Division 23 -Heati ng, Ventilating & Air Conditioning Equipment <br /> HVAC $ 311,750 $ 175,000 $ 486,750 <br /> Equipment INC INC INC <br /> Ductwork INC INC INC <br /> Refrigerant Piping INC INC INC <br /> Controls INC INC INC <br /> Other NA NA NA <br /> <br />Division 26-Electr ical <br /> Lighting $ 718,373 $ 291,397 $ 1,009,770 <br />LA Power INC INC INC <br /> Service and Distribution INC INC INC <br /> <br />Division 27 -Comm unications <br /> Data/Communications INC INC INC <br /> <br /> <br /> <br />Division 28-Electro nic Safety & Security <br /> Fire Alarm INC INC INC <br /> <br />Division 31-Earth work <br /> Demolition INC INC INC <br /> Grading $ 194,975 <br />$ 49,598 <br />$ 244,573 <br /> <br /> <br />Division 32 -Exterio r Improvements <br /> Asphalt Paving & Pavement Markings $ 156,500 $ 11500 $ 158,000 <br /> Concrete Sidewalks and Curbs INC INC INC <br /> Fences and Gates $ 227,932 $ 27,895 $ 255,827 <br /> Landscaping & Irrigation $ 289,000 $ 36,000 $ 325,000 <br /> SWPPP Erosion Control $ 47,600 $ 19,600 $ 67,200 <br /> <br />Division 33 -Utilitie s <br /> utilities $ 142,085 <br />$ 82,325 <br />$ 224,410 <br /> <br /> <br /> <br /> Subtotal [Divisions, 2-33): $ 7,062,594 $ 2,928,982 $ 9,991,576 <br /> <br /> <br /> Bonds $ 51,359 $ 22,105 $ 73,464 <br />I nsurance (Casualty Insurance & Builder's Risk Insurance) $ 81,254 $ 34,973 $ 116,227 <br /> Overhead & Profit $ 210,801 $ 90,730 $ 301,531 <br /> <br />a District Contingency (List any contingencies' do so sparingly and <br />s specifically as possible) <br />NA <br />NA <br />NA <br /> TOTAL BID $ 7,665,481 $ 3,299,289 $ 10,964,770 <br /> <br /> Allowances per District Instructions: 1) Interim Housing & <br />Refurbishing of Playfield <br />$ 250,000 <br />NA <br />$ 250,000 <br />A llowances per District Instructions: 2) Unforeseen and <br />Undirected scope of work <br />' <br />$ 150,000 <br />$ 150,000 <br />$ 300,000 <br /> on[ractor <br />s Guaranteed Project Costs $ 3,449,289 <br />dditional Soft Costs <br />Total Cost <br />8,065,481 $ 350,000. <br />3,799,289 <br />11,514,770 <br />PAGE 2 <br />SANTA ANA L'NI IF.D SCHOOL DISTRICT- GARFIELD ELE\21i ?RW Bum IL" 17 Construction