My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - EMERGENCY TRANSPORTATION SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
09/17/2012
>
25F - AGMT - EMERGENCY TRANSPORTATION SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2012 3:37:36 PM
Creation date
9/13/2012 3:36:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Manager's Office
Item #
25F
Date
9/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approval of Fire/EMS Emergency Ambulance <br />Transportation and Related Services Agreement <br />September 17, 2012 <br />Page 5 <br />Staff also provided bidders with updated 9-1-1 Santa Ana EMS call and transport statistics based <br />on actual volume from the first 60 days of the transition to OCFA. <br />Public Bid Opening <br />On July 9, 2012, proposals were received from all three prequalified providers. Consistent with <br />the State EMS requirements, a public bid opening was conducted. During the bid opening, the <br />following information was released and made public with all three bidders in attendance: <br />A. RFP number <br />B. Submission date <br />C. General description of service being procured <br />D. Names of responders <br />E. Amounts proposed: <br />a. Transports for Initial Year Service Period <br />b. Optional: Transports + Ambulance Billing <br />Evaluation Process Oversight <br />Orange County Emergency Medical Services (OCEMS) staff have been involved in the RFP <br />Process (both Phase I and II) since inception. Consistent with the State guidelines, the role of <br />OCEMS oversight is to ensure that the RFP process (from issuance of the RFP to ultimate <br />contract award) was conducted in a fair and competitive manner. The competitive RFP process <br />utilized by City of Santa Ana, including Phase I and II RFP's, was submitted to Orange County <br />EMSA (OCEMSA) and the State Emergency Medical Services Authority and was approved by <br />both agencies. <br />Overview of Proposal Evaluation Process in Phase 11 <br />The focus of the comprehensive evaluation process was to select the bidder that provided the <br />most thorough, and competitive bid proposal and program design that would meet or exceed the <br />performance standards set forth in the RFP. <br />All three proposals proceeded to the evaluation process, which was designed to accomplish the <br />following goals: <br />• Provide a method of evaluating each proposal not just on its own merits, but as it <br />compares to the other proposals under evaluation. <br />• Provide a method of evaluation that is fair and unbiased. <br />• Provide a method that evaluates the: <br />¦ Bidder's business as a whole, and <br />¦ 2) Proposal specific to the operational needs of the City of Santa Ana in the <br />delivery of 9-1-1 emergency transportation services. <br />25F-5
The URL can be used to link to this page
Your browser does not support the video tag.