My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J & G INDUSTRIES INCORPORATED - 2012
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
J & G INDUSTRIES INCORPORATED - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 4:42:27 PM
Creation date
9/20/2012 3:33:33 PM
Metadata
Fields
Template:
Contracts
Company Name
J & G INDUSTRIES INCORPORATED
Contract #
A-2012-089
Agency
PUBLIC WORKS
Council Approval Date
5/7/2012
Expiration Date
6/30/2013
Insurance Exp Date
10/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana March 26, 2092 <br />Request for Proposals Demolition Services <br />field workers. J&G's consultant will periodically conduct site safety inspections. Results are <br />given to the Project Manager for directing changes. <br />Underground Service Alert will be contacted to have the location of utilities marked. The <br />Project Manager shall contact utility companies to coordinate any required utility terminations. <br />Where required, sewer -capping will occur at the beginning of work. The Field Superintendent <br />will be on site at the time the agency is scheduled to inspect the utility termination. <br />Care shall be taken to perform the services so as not to endanger the safety of any person or <br />property. At the start of the CTO, the Field Superintendent will visually survey existing <br />improvements and utilities near the work site, in order to protect them from damage. Field <br />Superintendent will also visually survey the site for potential materials containing <br />regulated/hazardous wastes. The Project Manager will contact CSA of any findings. <br />As directed by the CSA, the Project Manger will arrange for J&G's consultant to perform an <br />asbestos and lead-based paint survey and an abatement plan for the asbestos and lead <br />containing materials removal and disposal. When an asbestos and lead-based paint survey <br />has been previously prepared, the Project Manager will arrange for J&G's subcontractor to <br />prepare an abatement plan. The abatement plan will be submitted to the SCAQMD for their <br />approval. The Project Manger shall confirm that ail required licenses, permits and certifications <br />have been acquired for implementing the abatement plan. The Project Manager will submit the <br />SCAQMD approved abatement plan for CSA approval to proceed with its implementation. <br />Upon CSA's approval, J&G's abatement subcontractor will implement the abatement plan. <br />Field Superintendent will verify waste is properly manifested for disposal at proper facility. <br />Upon completion of abatement pian implementation, the Field Superintendent will conduct a <br />pre -demolition survey to identify: that the asbestos, lead, regulated and hazardous wastes <br />have been removed as per their abatement plans; verify monitoring records; verify proper <br />manifesting of waste disposal; visually verify no other hazardous materials are left in <br />demolition area; as required, verify site is secured by appropriate fencing; verify that <br />appropriate protection devices are in place, such as pedestrian protection canopy; verify <br />appropriate signing displayed (i.e. no trespassing, keep out demolition in progress, danger, <br />etc.); verify all utilities have been terminated; and erosion control measures are in place, as <br />needed and required. The Field Superintendent will use a checklist to complete the pre - <br />demolition survey. The Field Superintendent will confirm with the Project Manger that the <br />J&G Industries Page 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.