City of Santa Ana March 28, 2012 <br />Request for Proposals Demolition Services <br />demolition area is ready for demolition. Structures ready for demolished will be clearly marked <br />"CLEAR FOR DEMO J&G." <br />Field Superintendent will direct crews in: structure demolition; improvements demolition; <br />salvaging procedures; solid waste clearing and disposal. Where practical, concrete, asphalt, <br />steel, non-ferrous metals, and wood will be segregated and sent off-site for recycling. If <br />required, the site will be backfilled and graded. Field Superintendent will review fieldwork daily <br />for compliance with CTO specifications and record findings in a quality control log. <br />Field personnel are trained to stop work upon the discovery of suspect asbestos, regulated, or <br />hazardous waste. The Field Superintendent will contact the Project Manager, who in turn will <br />contact CSA. The Field Superintendent shall leave the work site in a clean and neat condition, <br />upon completion of the CTO. The Project Manager will notify those agencies required for final <br />inspections and sign offs. <br />The Project Manager will track the CTO schedule and budget by using project management <br />software. Schedule and budget updates will be provided to the CSA as required. Project <br />Manager will notify CSA to have all work inspected within 24 hours of CTO work completion. <br />The Project Manager will prepare all required paperwork for final closure package and billing <br />for the project. <br />Activities <br />Activities for the assigned personnel by job category include, but are not limited to: <br />Project Manager: <br />• First, managing services required to be performed within 24 hours of CTO execution <br />• Directing consultant to prepare a Notice of Intent (NOI) to comply with terms of general <br />permit to discharge storm water associated with construction activity, for sites that are one <br />acre or larger in size <br />• Submittal of the NOI and permit fee to the State Water Resources Control Board <br />• Directing consultant to prepare a Construction Storm Water Pollution Prevention Plan <br />(SWPPP), when required; storm water best management practices will be implemented as <br />needed for compliance with the SWPPP <br />JAG Industries Page 28 <br />