My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COSTA MESA, CITY OF (3)-2012
Clerk
>
Contracts / Agreements
>
C
>
COSTA MESA, CITY OF (3)-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2013 5:20:35 PM
Creation date
9/26/2012 9:42:09 AM
Metadata
Fields
Template:
Contracts
Company Name
COSTA MESA, CITY OF
Contract #
A-2012-149
Agency
PUBLIC WORKS
Council Approval Date
7/2/2012
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT' DESCRIP11ON <br />Agencies: City of Costa Mesa, City of Santa .Ana, Ca.ltrans <br />Project Name: Fairview Road Signal Synchronization Project <br />Program: Program P, regional Traffic Signal Synchronization (RXSSP) <br />Project Manager: Debra Bieber- Phone: (714) 754-5183 <br />Email: dbieberUci.costa-tttesa.ca.us <br />Project I±unding Program <br />"The intent of the proposed Fairview Road. project is to synchronize the 31 traffic signals <br />on the contiguous lairview Road corridor from State Route 55 to State Route ""I 'Phis <br />8.5 Mile corridor crosses the jurisdictions of Costa Mesa, Santa Ana and Caltrans. <br />Fairview Road is a designated signal synchronized network route, identified in the CTFP <br />Chapter 8 Guidelines, and is a heavily travelled hus route. `The :route intersections carry <br />Average Daily Traffic Volumes up to 61,800, with a Vehicle Miles of`T'ravel(VMT) of <br />314,056 along the corridor. Before and after studies will be made in the required <br />fornvat, to verify that the field-implemented timings have improved the existing traffic <br />patterns. The intersection timing improvements should result in measurable changes to <br />trmel time, green house gases and travel speeds. `To accomplish this project the <br />participating agencies will design, construct and implement a project to replace <br />antiquated controller units, enhance communication for signal synchronization, acrid <br />(Closed Circuit "Television) CCTV cameras and install controller cabinet replacements <br />directly enhancing signal synchronization, _Detection, communications systems and <br />necessary equipment and devices will be installed and monitored as required by Program <br />P to improve and maintain the corridor for a minimum of 4 years after con-rpletion. <br />Project Background <br />Fairview Road is a complete contiguous corridor, an important mass transit route, and an <br />import ant north-south connector between State Highways on the Master Plan of Arterial <br />Highways (MPAI l) and on the signal synchronization network per Figure 8-1. of the <br />CTFP Guidelines. Fairview road serves regional facilities such is Downtown Santa Ana' <br />County <ind Federal Buildings, Orange Coast Community College, Santa Ana College, <br />the Coast Community School District, the Segerstrom Center for the Arts (formerly the
The URL can be used to link to this page
Your browser does not support the video tag.