My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - EIR AT 1584 E SANTA CLARA AVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
10/15/2012
>
25A - AGMT - EIR AT 1584 E SANTA CLARA AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2012 11:37:18 AM
Creation date
10/15/2012 11:35:46 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25A
Date
10/15/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Vince C. Fregoso <br />City of Santa Ana <br />Page 2 of 6 <br />TASK 01- DISCUSSION OF NEW ALTERNATIVE <br />URS will meet internally to discuss the Hybrid Development Alternative and develop methods of <br />analysis. URS will participate in one (1) conference call with City staff to discuss the Hybrid <br />Development Alternative with respect to the public testimony received at the HRC Hearing on June <br />28, 2012. Up to three (3) URS staff will participate in the internal meeting and conference call with <br />the City. <br />TASK 02 - TECHNICAL MEMORANDUMS TO ANALYZE ALTERNATIVE <br />Technical Memorandums, prepared as addenda to existing-technical studies, will be provided for the <br />following technical resources to analyze the Hybrid Development' Alternative; (1) Cultural <br />Resources and (2) Transportation/Traffic. The Technical Memorand»tns will analyze only the <br />Hybrid Development Alternative. URS internal technical review will be performed by Senior URS <br />staff on Technical Memorandums prepared for the project. Should additional Technical <br />Memorandums be required for other technical studies, a separate arnendment will be required. The <br />Technical Memorandums will be prepared with available inf. rmation provided by the City, URS <br />will participate in one (1) conference call ,with the City with up to three (3) URS staff during the <br />assessment of the alternative and preparation of the Technical Memorandums. <br />Assumptions: <br />1. Concurrent with the Noticcto Proceed, the City will provide URS with a final description of <br />the Hybrid Development Alternative to be considered as a result of Task 01 above. <br />2. New Technical Reports will not be required for the Hybrid Development Alternative. <br />3. URS will ;provide as electronic copy of the two (2) Technical Memorandums for City staff <br />review and comment. <br />4. URS will address and incorporate one (1) round of comments/review provided by the City on <br />the hvo (2) Technical Memorandums. <br />5. URS will participate in one (1) conference call with the City with up to three (3) URS staff to <br />discuss the alternative and the preparation of the Technical Memorandums. <br />TASK 03 - EIR REVISIONS AND ANALYSIS OF ADDITIONAL ALTERNATIVE <br />As a result of the project, property?s recent listing and status as a local historical resource, a more <br />substantial level of analysis_ is: required to consider if the project and the project alternatives will <br />affect the property's historical significance, and potentially have a significant impact that cannot be <br />mitigated to a level less than significant. The Sexlinger property is a rural cultural landscape, which <br />makes it a more complex resource than a physical structure, and includes features such as circulation <br />networks, responses to its natural environment, viewslueds and vistas, landscape dividers, and site <br />furnishings and ancillary features. This analysis will be needed as part of the re-circulated EIR. <br />Project impacts from the original project (24 homes) must now be analyzed to determine significant <br />impacts to the historical resources. Under the proposed project, the entire property would be <br />25A-7
The URL can be used to link to this page
Your browser does not support the video tag.