Laserfiche WebLink
Project 12-6775 <br />Request for Approval of Change Order No. 1 <br />May 20, 2013 <br />Page 4 of 4 <br />COST ANALYSIS <br />Revised Bid Item Quantities (The contractor will be paid for actual quantities added and deleted, as <br />verified in the field.) <br /> <br />BID ITEMS <br />UNIT <br />QTY UNIT <br />PRICE <br />COST <br />I Unclassified Excavation CY 65 $40.00 $3,400.00 <br />12 Construct PCC Bus Pad SF 1,000 $5.75 $5,750.00 <br />Add Construct PCC Drivewa Approach (T=8" SF 425 $5.75 $2,443.75 <br />Add Miscellaneous Crushed Base TN 17.42 $8.09 $140.92 <br />Add Traffic Loops EA 10 $350.00 $3,500.00 <br />Add AC Saw Cut LS I $1,200.00 $1,200,00 <br />Add Traffic Control LS 1 $2,025.00 $2,025.00 <br />Add Mobilization LS l $1,158.00 $1,158.00 <br />TOTAL CHANGE ORDER NO. 1 $19,617.67