My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBI GROUP 6 - 2012
Clerk
>
Contracts / Agreements
>
I
>
IBI GROUP 6 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 2:57:34 PM
Creation date
12/20/2012 9:39:22 AM
Metadata
Fields
Template:
Contracts
Company Name
IBI GROUP
Contract #
A-2012-172
Agency
PUBLIC WORKS
Council Approval Date
8/6/2012
Expiration Date
6/20/2013
Insurance Exp Date
4/30/2014
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana Circulation Element <br />Update <br />Santa Ana , CA <br />IBI Group is leading the effort to update the City <br />of Santa Ana General Plan Circulation Element. As <br />part of this project, IBI Group is performing the <br />following tasks: establishing Circulation Element goals, <br />objectives, and policies; evaluating impacts that traffic <br />growth will have on the circulation within the City and <br />recommending appropriate improvements to mitigate <br />these impacts; updating the objectives and policies <br />for public transit, bicycle, and pedestrian facilities; <br />providing objectives and policies for transportation <br />demand management, intelligent transportation <br />systems, traffic calming measures; and providing <br />modeling and analysis of alternative future network <br />� trc , old Line Foothill Phase <br />Extension Sus Interface and <br />Parking Garages <br />Sari Gabriel Va € €ey, CA <br />The Metro Gold Line Foothill Extension will run from <br />its current terminus in the City of Pasadena to the City <br />of Montclair, 26 miles to the east. Upon completion, a <br />dozen new stations will mean that 11 additional cities <br />will be served by the Metro Rail system. IBI Group is <br />supporting the Construction Authority on an effort <br />to resolve issues relating to the interface between <br />different travel modes, neighborhood connectivity, <br />and the proposed rail line. The aim is to create an <br />integrated transit system that will allow its users to <br />move effortlessly between transit and their destination. <br />A key element of this work is the conceptual design <br />of park- and -ride facilities for the Phase 2A stations <br />between Arcadia and Azusa. IBI Group is working to <br />layout designs for these garages and to locate bus <br />stops and prepare prototypical bus stop treatments <br />near the park- and -ride facilities. <br />City of Santa Ana <br />NO 12-0 3 x�,inca Ma aemmn' Plan � ""(1, ua;; a 4p, �ecm al T anspt r -, Or er <br />� G Complete Street? <br />Y <br />Pt cir - .Other ®.: ®00 ® ®m0❑❑❑ a ®O❑®O❑ <br />n1 it tyou _ -.� ❑ .r. t� � v... t�OO <br />ken pp� <br />.� t ing ❑� <br />assumptions. An important component of this study <br />is updating the Circulation Element to comply with the <br />State requirements for Complete Streets planning, <br />which require that roadways accommodate all users <br />from autos to transit to bicyclists and pedestrians. <br />IBI Group 6,11.!2 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.