My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBI GROUP 6 - 2012
Clerk
>
Contracts / Agreements
>
I
>
IBI GROUP 6 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 2:57:34 PM
Creation date
12/20/2012 9:39:22 AM
Metadata
Fields
Template:
Contracts
Company Name
IBI GROUP
Contract #
A-2012-172
Agency
PUBLIC WORKS
Council Approval Date
8/6/2012
Expiration Date
6/20/2013
Insurance Exp Date
4/30/2014
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Montclair Specific Plan/ <br />Metrolink Station Parking Demand <br />Study <br />Les Angeles, CA <br />IBI Group prepared a parking demand analysis for the <br />proposed North Montclair Specific Plan area. The <br />specific plan calls for the development of over 1,500 <br />residential units and retail development around the <br />existing Montclair Metrolink commuter rail station. <br />The parking demand analysis quantified the parking <br />demands of the new development and recommended <br />a target number of public parking spaces that should <br />be included in the specific plan area to serve new <br />development and park- and -ride commuters at the rail <br />station. The study also included the development of <br />conceptual parking garage layouts for the relocation <br />of surface parking at the Metrolink station. This <br />assignment was completed as part of the Southern <br />California Association of Government's (SCAG) 2% <br />Growth Strategy study. <br />I jah�=._;I C#anyon Metrohnk Station <br />IanC tads; Report <br />Anahe'lm, CA <br />IBI Group prepared a Project Study Report (PSR) <br />for the expansion of the Anaheim Canyon Metrolink <br />Station. A primary element of the PSR is the <br />preparation of a parking demand study for the <br />proposed expansion of the station. Parking demand at <br />the station is currently exceeding available supply and <br />the spill -over parking demand is impacting an adjacent <br />office development. The parking demand study <br />identifies the potential future demand for parking at the <br />station and identifies potential alternatives to provide <br />sufficient parking for each project phase, during <br />construction, and at project completion. <br />City of Santa Ana <br />NOi 12 01131 irn t9, i;, rt Plan at the SamaAn, I eomr, al T ansp.r at.,n I <br />-. <br />t <br />. -' <br />Oak <br />OL <br />" 7 ums <br />o*"* _ <br />Ti <br />All <br />..�.riws <br />`i war Timms_ _ : �,� _J <br />Ili -. t <br />! u I <br />- 711 <br />f <br />IBI Group £.11.125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.