My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 8E - 2012
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
PLANNING CENTER, THE 8E - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 1:26:22 PM
Creation date
1/9/2013 12:15:08 PM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2012-074
Agency
PUBLIC WORKS
Council Approval Date
4/2/2012
Expiration Date
12/31/2013
Insurance Exp Date
7/1/2014
Destruction Year
2020
Notes
Amends A-2007-167, A-2008-139, -001, -002, -003 Amended by A-2013-025, -01
Document Relationships
PLACEWORKS FORMERLY KNOWN AS THE PLANNING CENTER 8g - 2013
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8 - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8A - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8B - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8C - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8D - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8F - 2013
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverable: <br />Draft and Final Preliminary Engineering Plans <br />In{ I'LIMINARY cos'r ESTIMATE <br />This task involves the development of planning -level construction associated with the build alternative, Budget -level <br />estimates for future project phases will be developed based on estimated construction costs. <br />Construction Cost Estimates <br />1131 will use the engineering plans and utilities and drainage studies to prepare planning level estimates for probable <br />construction costs for each of the build alternatives. Quantities and costs will be organized in these categories: civil /roachvay, <br />earthwork, traffic, retaining walls, utility relocations, drainage modiftcations, and landscaping and irrigation. Cost items <br />tinder each section will include unit cost, estimated quantity, and total cost. Lump sums for supplemental items (e.g., <br />temporary erosion control) and Items not quantifiable at this phase will be calculated as a percentage of the total. An overall <br />contingency will be applied to account for unknowns. Unit cost information will be obtained from published sources (2007 <br />Caltrans Cost Data Book, Butt 2008 Costbook for Public Works, etc.) and recent relevant projects. <br />City staff will review an Initial cost estimate template (including cost Items and their associated unit costs). After they concur, <br />cost estimates will be prepared and draft street Improvement plans and cost eslimates will be submitted to the City at the <br />same time as the Preliminary ringineering Report, Cost estimate calculation worksheets will be included in the appendix. <br />Cost Estimates for Future Project Phases <br />1131 will use the conduction and ROW cost estimates to develop budget -level costs for each build alternative of subsequent <br />project phases, including: final design (PSH) and construction managennent. These costs will be in the Prelbninary <br />Engineering Report, with any backup.calculation information included in the appendix. <br />Deliverable: <br />• Cost Ntimate Summary Worksheets <br />RIGHT-OF-WAY MAPS - Based on the selected roadway improvement plans, VA Consulting will prepare 24' x 36" <br />ROW maps at it scale of 1" =40'. These maps will include existing and-new street centerlines, existing and proposed right of <br />way lines, property lines, agency boundaries, all adjacent parcels and cross - streets, topography, building footprints, parcel <br />numbers, addresses, indication if full or partial take of each property and amount of ROW being taken from each parcel. <br />Deliverable: <br />O Final snaps on mylar and electronically as both pdf and dgn files. <br />SURVEYS AND GIS MAPPING <br />Establish environmental baseline data In a manner compatible with engineering and topographic mapping. Coordinate with <br />Base;4fapping (165,10.20) on the environmental components /data to be included in the GIS database, including Section 4(f) <br />resources, historic properties, 100 -year fioodplain, hazardous materials sites, sensitive visual features, land uses and right -of- <br />way and noise receptors. Data from publicly available, sources will be used as a starting point and adjusted, as appropriate, <br />based on field surveys and observations conducted by The Planning Center team, Data will be provided lit a manner <br />consistent with the base snapping (160.10.20) to ensure that the datasets are compatible and call be utilized for evaluation of <br />each alternative's effects on the environment. <br />City o! Santa Ana - Proposal to Prepare Environmental Documents for Warner Avenue Widening Project The Planning Center I Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.