Laserfiche WebLink
Environmental Studies <br />Environmental technical studies provide the key data, analysis, findings, and nitigation recommendations that are <br />incorporated into the EIR. While broken flown into several different tasks, The Planning Center team views the technical <br />study effort as a fully integrated process with the engineering and outreach processes, as well as internally between <br />environmental tasks. <br />TRAFFIC IMPACT ANALYSIS <br />IbI Group will perforni a Traffic hnpact Analysis (TiA) for the Warner Avenue project according to the latest adopted City of <br />Santa Ana standards and guidelines. The objective of the TIA will be to establish future traffic conditions with the proposed <br />project and identify tragic mitigation measures that iii-ay be necessary to address project - related tragic impacts. The traffic <br />impact analysis will incorporate the following components: <br />Data CollectionlExisting Traffic Conditions <br />iBi will evaluate existing traffic and circulation conditions in the vicinity of the project site which includes (lie following <br />components: 1) intersection operating conditions for typical weekday AM /PM peak hour conditions, 2) descriptions of <br />geometric roadway conditions within and adjacent to. the project site, 3) description of existing transit services hi the vicinity <br />of project site, and 4) roadway daily traffic vohones and fleet mix. <br />Peak period traffic counts will be conducted as necessary to establish the existing condition at study Intersections. IBI Group <br />will work with the City of Santa Ann to identify appropriate study intersections and to obtahh existing counts available front <br />the City. The traffic scope assunies the analysis of signalized intersections within the project limits, as well as the next major <br />signalized intersections to the east and west of the project limits (assumed to be Flower Street and Wright Street). We also <br />propose to include the intersections of Main Street and Grand Avenue with Dyer Road and Edinger Avenue to assess the <br />changes in traffic conditions along the parallel east -west corridors with the hnpieinentation of the proposed project. IBI <br />Group will also conduct daily roadway traffic counts within the project limits to determine the existing traffic volumes. These <br />traffic counts will Include the collection of vehicle axle data to determine the existing vehicle fleet mix for inclusion 1n the <br />noise and air quality studies for the environmental document. IBI will field review all study intersections to determine <br />existing geometric conditions including number and type of lanes and signal phasing. Existing intersection operating <br />conditions (in terns .of volume /capacity ratios and level of service) will be quantified using the ICU analysis inethodology as <br />adopted by the City of Santa Ana. <br />Future Conditions <br />Per California Environmental Quality Act (CEQA) guidelines, IBI will forecast fixture traffic conditions without the proposed <br />project. We will work with (lie City of Santa Ana to develop an appropriate forecast of future traffic conditions for the <br />roadway. One option includes the use of the Orange County Transportation.Analysis Model (OCTANT) to develop future <br />forecast traffic volumes. This is the regional model for Orange County and uses the four -step process outlined by the City of <br />Santa Ana In the RFP to develop future traffic forecasts. We will work with OCTA to develop traffic forecasts for the future <br />without and with project conditions, allowing for a coniparlson of traffic volumes in the study corridor between the two <br />future scenarios. We will also obtain future forecast traffic volumes for other appropriate study streets Including ivialh Street, <br />Grind Avenue, Dyer Road and Edinger Avenue. Study intersections that are forecast to experience an increase in level of <br />service chic to cumulative project - related traffic will be highlighted. Graphics and tables will be used to Illustrate the future <br />no- project traffic analysis results. The future with project traffic conditions will analyze the performance of the roadway and <br />study Intersections following the Iniplenientation of the proposed f xnprovenients. Any significant impacts that result front the <br />proposed project will be Identified and appropriate mitigation measures will be developed to address these hnpacts. <br />City of Santa Ana • Proposal to Prepare Environmental Documents for Warner Avenue Widening Project Ilia Planning Center I Page 8 <br />