My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - ENVIRONMENTAL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
01/22/2013
>
25A - AGMT - ENVIRONMENTAL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2013 2:33:11 PM
Creation date
1/17/2013 2:29:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25A
Date
1/22/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.2.1 Optional Streamline Review <br />As of November 2012, the City of Santa Ana does not quality for streamlined <br />HCD review under draft streamlining requirements. If circumstances change <br />and the City does qualify, City staff can complete the streamlining worksheet <br />prior to HCD submittal. We will review the City's worksheets and edit if <br />necessary. We will only perform and bill to this task if authorized by the City. <br />3.3 Final Housing Element <br />Following a letter of compliance, The Planning CenterJDC&E will assemble the <br />final housing element policy framework and housing technical report for public <br />distribution, noticed public hearings before the Planning Commission and City <br />Council, and inclusion on the City's website. <br />Deliverable(s): <br />- Draft Housing Element (6 bound copies and 1 PDF) <br />- Draft Housing Element for public review (1o bound copies and 1 PDF) <br />- HCD Review Draft Housing Element (1 unbound copy and 1 PDF) <br />- Final Housing Element (1o bound copies and 1 CD of all final files) <br />TASK 4. AB 162 COMPLIANCE <br />Assembly Bill 162 strengthens flood protections by requiring jurisdictions to <br />update flood-related information in its General Plan during the mandatory <br />revision to the housing element. Flooding information is in the City of Santa <br />Ana General Plan Safety Element and was last updated in 1982. The safety <br />element should be updated to include a more recent narrative about flooding, <br />flood control improvements implemented since 1982, and policies or programs <br />about maintaining FEMA maps. Currently the flood hazards map is combined <br />with fire hazards. Those hazards should be separated into their own maps and <br />updated at the same time. <br />This scope and the associated budget assumes the safety element update will <br />be limited to compliance with AB 162 and by completed by City staff (including <br />GIS maps). We will review the City's maps and edits to the safety element. The <br />City will also lead presentations on updates to the safety element to the <br />Planning Commission and City Council at the same hearings as the HCD- <br />approved housing element. Environmental clearance for the safety element <br />update will be combined with the negative declaration for the housing <br />element. <br />Deliverable(s): <br />- Edits on Draft Safety Element (1 PDF) <br />- Edits on Final Safety Element (1 PDF) <br />TASK 5. ENVIRONMENTAL CLEARANCE <br />The Planning CenterJDC&E will coordinate closely with the City to ensure that <br />the Initial Study and Negative Declaration (IS/ND) are legally defensible and <br />accurate. The Planning CenterJDC&E will prepare an IS/ND in compliance with <br />state law. We will also circulate the IS/ND to the appropriate state and local <br />25A-20
The URL can be used to link to this page
Your browser does not support the video tag.