My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - ENVIRONMENTAL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
01/22/2013
>
25A - AGMT - ENVIRONMENTAL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2013 2:33:11 PM
Creation date
1/17/2013 2:29:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25A
Date
1/22/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
agencies. We do not anticipate that changes will arise from the update that <br />will require enhanced environmental review. The IS/ND will cover the housing <br />element and limited safety element update described in this scope of work. <br />The IS/ND project manager, JoAnn Hadfield, will coordinate with the City via <br />conference calls. She will be present at a scoping meeting for the IS/ND. <br />Additional meetings or attendance by other members of the consultant team <br />will be billed on a time-and-materials basis. Costs for meeting attendance will <br />be billed in accordance with the hourly rates forthe personnel involved. <br />Within five days of project approval, The Planning CenterlDC&E will prepare an <br />NOD. The City will be responsible for filing the NOD and paying associated <br />fees, as well as the production of 45 CDs for distribution. We will email <br />electronic versions of the files and CD label. <br />Deliverable(s): <br />- Screencheck Draft IS (1 electronic copy in Word format) <br />- Public Review IS/ND (1 PDF) <br />- Final IS/ND (1 PDF) <br />- Notice of Determination (1 PDF) <br />TASK 6. PROJECT MANAGEMENT <br />Project coordination between staff and the consulting team and between <br />members of the consulting team is critical to a successful housing element <br />project. Accounting and overall project management coordination is also <br />required. Colin Drukker will serve as the project manager for the housing <br />element and is responsible for leading the project from beginning to <br />completion. This task includes the project kick-off meeting and up to 11 status <br />meetings with staff six at City Hall or our office and five via conference call. <br />Deliverable(s): <br />- Monthly progress reports (so) <br />Project Schedule <br />The housing element RFP recognizes the complexity of the project and the <br />tight time frame to complete it. The following schedule is proposed. <br />Project Schedule <br />Task Month <br />Project kick-off meeting January <br />Draft Housing Technical Report, Draft Safety Element update January-March <br />Public Workshops (4), City review of Draft Safety Element March <br />Draft Housing Element preparation, revisions to Safety Element April <br />City review and revise Housing Element (up to two drafts), Initial <br />Study Scopin meeting after 2nd Draft May-June <br />Submit the Housing Element toHCD Mid-July <br />Study Sessions (up to 2) July-August <br />25A-21
The URL can be used to link to this page
Your browser does not support the video tag.