My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20E - AA - BRISTOL WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
01/22/2013
>
20E - AA - BRISTOL WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2013 5:20:51 PM
Creation date
1/17/2013 4:49:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20E
Date
1/22/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Contract Award for Bristol Street Widening <br /> and Bristol Street Water and Sewer Main Improvements <br /> January 22, 2013 <br /> Page 2 <br /> <br /> <br /> <br /> <br /> This project will widen Bristol Street from two to three lanes in each direction, add bike lanes, <br /> increase the sidewalk width, and add parkway and median landscaping. The widening will also <br /> include new traffic signals at the Santa Ana Boulevard and Civic Center Drive intersection, bus <br /> turnouts to improve traffic flow, bioswales to reduce surface run-off, sound walls adjacent to <br /> residential parcels, water and sewer system improvements, and a storm drain to improve drainage. <br /> Once completed, these improvements will enhance the ride quality, surface drainage, and visual <br /> appearance of the Bristol Street corridor. <br /> <br /> The Notice Inviting Bids was advertised on October 16 & 17, 2012, and bids were opened on <br /> November 15, 2012. A summary of the bid invitations mailed, bids received, and bid results is as <br /> follows: <br /> <br /> Contractor Participation Data <br /> <br /> Santa Ana Contractors receiving notices: 22 <br /> <br /> Contractors requesting bidding documents: 34 <br /> <br /> Bids received: 4 <br /> <br /> Bids received from Santa Ana Contractors: 0 <br /> Bid Results Summary <br /> RANK BIDDERS NAME LOCATION BID AMOUNT <br /> 1 All American Asphalt, Inc............. Corona ._._..._......_........._._....._..._...._$6,169,256_......_ <br /> _ <br /> 2 Lonerock, Inc. _ _ . _ . _ . _ _ . Laguna Hills $6.643..645 <br /> . . . . _ _ <br /> <br /> 3 ..._RJ...._ Noble Company, Inc............................. Oran ._e.................................................................$6,852,178 <br /> 4 Excel Paving Company, Inc. Lon Beach $7,482,458 <br /> A total of four bids were received and all were deemed responsive. The lowest bid was submitted <br /> by All American Asphalt, Inc., for $6,169,256, which is below the Engineer's estimate of <br /> $6,726,445. <br /> ENVIRONMENTAL IMPACT <br /> In accordance with the California Environmental Quality Act, the proposed project has been <br /> determined to be adequately evaluated in the previously prepared Environmental Impact <br /> Report/Environmental Impact Assessment EIR No. 89-01 approved by City Council in 1990. <br /> <br /> <br /> <br /> <br /> <br /> <br /> 20E-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.