Laserfiche WebLink
<br /> <br /> <br /> <br /> COOPERATIVE AGREEMENT NO. C-2-9992 <br /> ATTACHMENT A <br /> <br /> • Corridor lane configurations and lane widths; <br /> • Existing street and lane geometries, curbs, and medians; <br /> • Upcoming improvements to the corridor; <br /> • Traffic signs and pavement markings at all PROJECT intersections, <br /> approaches to cross streets, and along PROJECT corridor; <br /> • Traffic signal control device information, such as type of device, brand and <br /> make, condition of equipment. Intersection Photographic Documentation Log <br /> shall be required; <br /> • Existing signal operation characteristics - signal phasing, cycle lengths, phase <br /> sequence alteration, and protective-permissive, etc.; <br /> • Existing controller and telemetry/interconnect equipment; <br /> • Existing time-referencing setup; <br /> • Existing Central Master Equipment; <br /> • Existing Field Master Equipment; <br /> • Open each controller cabinet and take digital photos of all equipment inside; <br /> • Note any deficiencies of traffic control equipment at each intersection; and <br /> • Note the maintenance condition or existence of the traffic signal equipment, <br /> controllers and synchronization related infrastructure. <br /> CONSULTANT shall also investigate factors that are expected to affect signal <br /> progression including, but not limited to: intersections with high pedestrian or bicyclist <br /> volumes; over-saturated intersections; uneven lane distribution; high volumes of <br /> trucks and buses; high-volume un-signalized intersections, including interchanges; <br /> parking maneuvers; presence and location of bus stops; differing signal timing <br /> patterns among AGENCIES; etc. <br /> With the view of assisting, enhancing, and improving the traffic operations along this <br /> corridor, CONSULTANT shall identify any deficiencies of the existing traffic signal <br /> control and telemetry infrastructure, and geometric layout, and provide <br /> recommendations towards simple solutions that may be implemented to correct such <br /> deficiencies. <br /> CONSULTANT shall prepare a report summarizing the findings of the field review. <br /> <br /> If deemed necessary by the APM or through request of an AGENCY through the <br /> APM, CONSULTANT shall prepare any design construction documents in the form of <br /> sketches to full-fledged Plans Specifications and Estimates (PS & E). CONSULTANT <br /> shall prepare such plans for use in the construction of the PROJECT per each <br /> respective AGENCY's standards. CONSULTANT shall supply such documentation <br /> to the APM and the AGENCY owning the affected facility for approval prior to <br /> commencing any construction. Construction documents will be used during the <br /> course of construction by AGENCY for inspection services. CONSULTANT shall <br /> modify documents subject to approved construction completion to owning AGENCY <br /> as an As - Built document. Cost for production, reproduction, inspection services, <br /> and as - built services are part of the Full Fixed Price of the Contract and/or CTO and <br /> no additional compensation shall be allowed, therefore. <br /> <br /> <br /> 6 <br /> <br /> 25D-23 <br />