Laserfiche WebLink
Contract Award for Bristol Street Widening <br />and Bristol Street Water and Sewer Main Improvements <br />January 22, 2013 <br />Page 2 <br />This project will widen Bristol Street from two to three lanes in each direction, add bike lanes, <br />increase the sidewalk width, and add parkway and median landscaping. The widening will also <br />include new traffic signals at the Santa Ana Boulevard and Civic Center Drive intersection, bus <br />turnouts to improve traffic flow, bioswales to reduce surface run-off, sound walls adjacent to <br />residential parcels, water and sewer system improvements, and a storm drain to improve drainage. <br />Once completed, these improvements will enhance the ride quality, surface drainage, and visual <br />appearance of the Bristol Street corridor. <br />The Notice Inviting Bids was advertised on October 16 & 17, 2012, and bids were opened on <br />November 15, 2012. A summary of the bid invitations mailed, bids received, and bid results is as <br />follows: <br />Contractor Participation Data <br />Santa Ana Contractors receiving notices: 22 <br />............. ..... _ ...................... _........................... ..__........... _........................................... ....... ---.......... __._.......... _...................... ................................ _.__....... _................... .._.... -.----._..... ..................._._...... <br />Contractors requesting bidding documents: 34 <br />__ ...................._.._._....................................._............................_..........................._.....__..._.....---............._...................................................--.................-......................._.........................._._......._......... <br />Bids received: 4 <br />........ ...:........... .......................................................... .................... _._..... _........................ ........ ....... _..._............ _._.............................................. ....... .................... ................. --................. ........................... ....... <br />Bids received from Santa Ana Contractors: 0 <br />Bid Results Summary <br />RANK BIDDERS NAME LOCATION BID AMOUNT <br />1 <br />................................................. All American Asphalt, Inc <br />...._ ........ _............ ............................ _................ ........... -. Corona $6,169,256 <br /> <br /> <br />2 . <br />....... . . . .. .... ...................................... <br />. <br />Lonerock,..._ Inc. ........ _ .. _ . .. _ . - . _ ..... _ . <br />. . .._ . .. - - ......... ...._............. _............. ........... ... ..._ <br />.....-.--_._...._.-..._......-....... <br />Laguna Hills <br />................... _.................. --. ---..... ...... .............. ........ .._._....._...-...._ <br />._......- <br />$6.643..645 <br />........ ...................... --....._.................._._.....-._.... --._-..-- <br />............ <br />3 .................... <br />..._RJ...._ Noble Company, Inc............................. <br />Oran ._e............................................. <br />....................$6,852,178 <br />4 Excel Paving Company, Inc. Lon Beach $7,482,458 <br />A total of four bids were received and all were deemed responsive. The lowest bid was submitted <br />by All American Asphalt, Inc., for $6,169,256, which is below the Engineer's estimate of <br />$6,726,445. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the proposed project has been <br />determined to be adequately evaluated in the previously prepared Environmental Impact <br />Report/Environmental Impact Assessment EIR No. 89-01 approved by City Council in 1990. <br />20E-2