My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - ENVIRONMENTAL SERVICES FOR WARNER AVE WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
02/04/2013
>
25B - AGMT - ENVIRONMENTAL SERVICES FOR WARNER AVE WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2013 9:42:44 AM
Creation date
1/31/2013 4:49:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
2/4/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Studies <br />Environmental technical studies provide the key data, analysis, findings, and mitigation recommendations that are <br />incorporated into the EIR. While broken down into several different tasks, The Planning Center team views the technical <br />study effort as a filly integrated process with the engineering and outreach processes, as well as internally between <br />environmental tasks. <br />TRAFFIC IMPACT ANALYSIS <br />IBI Group will perform a Traffic Impact Analysis (TIA) for the Warner Avenue project according to the latest adopted City of <br />Santa Ana standards and guidelines. The objective of the TIA will be to establish future traffic conditions with the proposed <br />project and identify traffic mitigation measures that may be necessary to address project-related traffic impacts. The traffic <br />impact analysis will incorporate the following components: <br />Data Collection/Existing Traffic Conditions <br />IBI will evaluate existing traffic and circulation conditions in the vicinity of the project site which includes the following <br />components: 1) intersection operating conditions for typical weekday AM/PM peak hour conditions, 2) descriptions of <br />geometric roadway conditions within and adjacent to the project site, 3) description of existing transit services in the vicinity <br />of project site, and 4) roadway daily traffic volumes and fleet mix. <br />Peak period traffic counts will be conducted as necessary to establish the existing condition at study intersections. IBI Group <br />will work with the City of Santa Ana to identify appropriate study intersections and to obtain existing counts available from <br />the City. The traffic scope assumes the analysis of signalized intersections within the project limits, as well as the next major <br />signalized intersections to the east and west of the project limits (assumed to be Flower Street and Wright Street). We also <br />propose to include the intersections of Main Street and Grand Avenue with Dyer Road and Edinger Avenue to assess the <br />changes in traffic conditions along the parallel east-west corridors with the implementation of the proposed project. IBI <br />Group will also conduct daily roadway traffic counts within the project limits to determine the existing traffic volumes. These <br />traffic counts will include the collection of vehicle axle data to determine the existing vehicle fleet mix for inclusion In the <br />noise and air quality studies for the environmental document. IBI will field review all study intersections to determine <br />existing geometric conditions including member and type of lanes and signal phasing. Existing intersection operating <br />conditions (in terms of volume/capacity ratios and level of service) will be quantified using the ICU analysis methodology as <br />adopted by the City of Santa Ana. <br />Future Conditions <br />Per California Environmental Quality Act (CEQA) guidelines, IBI will forecast future traffic conditions without the proposed <br />project. We will work with the City of Santa Ana to develop an appropriate forecast of future traffic conditions for the <br />roadway. One option includes the use of the Orange County Transportation Analysis Model (OCTAM) to develop future <br />forecast traffic volumes. This is the regional model for Orange County and uses the four-step process outlined by the City of <br />Santa Ana in the RFP to develop future traffic forecasts. We will work with OCTA to develop traffic forecasts for the future <br />without and with project conditions, allowing for a comparison of traffic volumes in the study corridor between the two <br />future scenarios. We will also obtain future forecast traffic volumes for other appropriate study streets including Main Street, <br />Grand Avenue, Dyer Road and Edinger Avenue. Study intersections that are forecast to experience an increase in level of <br />service due to cumulative project-related traffic will be highlighted. Graphics and tables will be used to illustrate the future <br />no-project traffic analysis results. The future with project traffic conditions will analyze the performance of the roadway and <br />study intersections following the implementation of the proposed improvements. Any significant impacts that result from the <br />proposed project will be Identified and appropriate mitigation measures will be developed to address these impacts. <br />City of Santa Ana - Proposal to Prepare Environmental Documents for Warner Avenue Wtdenf% Project The Planning Center I Page i <br />25B-11
The URL can be used to link to this page
Your browser does not support the video tag.