My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - ENVIRONMENTAL SERVICES FOR WARNER AVE WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
02/04/2013
>
25B - AGMT - ENVIRONMENTAL SERVICES FOR WARNER AVE WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2013 9:42:44 AM
Creation date
1/31/2013 4:49:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
2/4/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDROLOGY AND DRAINAGE STUDIES <br />Drainage Analysis and Report <br />IBI Group will assemble and review the relevant available topographic data, as-built roadway and drainage facility plans, and <br />hydrology studies for the corridor to assess the existing conditions and the likely changes to the rum-off flow patterns and <br />quantities due to the proposed roadway widening alternatives. Up to three alternatives will be assessed. Based on this <br />assessment, the required modifications to the existing drainage facilities as a result of the proposed roadway widening <br />modifications will be conceptually defined. Only concept-level hydrology and hydraulic analyses will be used for this work <br />along with a preliminary assessment of the costs associated with the required drainage improvements. <br />The results of this analysis will be summarized in the Drainage Report, which will include a narrative of the assembled data, <br />analysis procedures and findings including a figure depicting existing and proposed drainage facilities. This report will be <br />Included as an attachment to the Preliminary Engineering Report. <br />Water Quality Documentation <br />Upon completion of the Drainage Report, IBI Group will prepare conceptual water quality (WQ) management <br />documentation for the Warner Avenue widening project area. The conceptual WQ documentation will identify potential <br />pollutants of concern, low-flow and nuisance flow drainage patterns, and preliminary water quality peak flow rates for a <br />single roadway widening concept. This documentation will recommend best management practices (BMPs) within the <br />project area to address water quality concerns. The conceptual WQ documentation will consist of a narrative describing <br />procedures, findings, and recommended BMPs as well as an exhibit identifying the placement of the recommended BMPs <br />within the project area. <br />Deliverables: <br />• Hydrology/Drainage Study report <br />• Conceptual WQ Documentation <br />UTILITIES AND EMERGENCY / COMMUNITY SERVICES <br />This task includes assembling utility data and preparing base maps of existing utilities. Existing utilities within the proposed <br />project area include water (Metropolitan Water and City of Santa Ana), sewer (Orange County Sanitation and City of Santa <br />Ana), power (SC Edison), gas (SC Gas), and telephone/communication lines (AT&T Transmission & Distribution, <br />MCI/Verizon, MPower Communications, Airtouch Cellular, and Adelphia). <br />The Planning Center will coordinate with the Santa Ana Fire Department, Santa Ana Police Department, and Santa Ana <br />Parks, Recreation and Community Services Agency to ensure that the appropriate agency has input regarding any potential <br />impacts created by the proposed project. <br />GEOTECHNICAL REPORT SUMMARY <br />All work will be based on an office study. No drilling or sampling is proposed. It is understood that environmental issues will <br />be dealt with by other team members. Allowance has been made for a site reconnaissance to view conditions of the existing <br />pavement and other surface features which may Impact site preparation and grading for the widening. This will be followed <br />by compilation and review of available information including: Seismic hazard maps, Literature on geology and seismology, <br />County and City files, In-house data. <br />As the project develops, it Is anticipated that there will be a requirement for discussion and/or meetings dealing with geologic <br />hazards and geotechnical issues of significance to the project. In addition, GLA will assist with appropriate sections of the <br />environmental documents, and will prepare a stand-alone appendix dealing with the following: Regional geology, <br />City of Santa Ana - Proposal to Prepare Environmental Documents for Warner Avenue Widentiug Project The Planning Center I Page 10 <br />25B-13
The URL can be used to link to this page
Your browser does not support the video tag.