My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 5:45:50 PM
Creation date
2/5/2013 8:44:36 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Contract #
Various
Agency
Public Works
Council Approval Date
1/22/2013
Destruction Year
2018
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
101DGO��7 7m ►���11�1ui <br />Kevin O'Rourke <br />To: Interim City Manager <br />William Galvez, Acting Executive Director <br />From: Public Works Agency <br />(?1h <br />Date: July 24, z % 4L 3 3 AM € .- S4 <br />Project Nos. 08 -1700, 12 -6421, 12 -6422 <br />Bristol Street Widening From 2nd Street to 10th Street <br />Subject: Change Order No. 1 <br />Contractor: All American Asphalt <br />PO BOX 2229 <br />Corona, CA 92878 <br />pNA <br />Project Description: 08 -1700; Bristol Street Widening from 2nd Street To 10th Street, <br />12- 6421;Bristol Street Water Main Improvements from 3rd Street to <br />10th Street, 12 -6422; Bristol Street Sewer Main Improvements from 3rd <br />Street to 10th Street. <br />Change Order Number: <br />Change Order Total: $ 79,333 <br />Accounting Unit - Account - Activity Number: 05917661- 66220 - 08170001028 <br />03217662 - 66220 - 08170002028 <br />03017660 - 66220 - 08170003028 <br />05617640 - 66220 - 12642201028 <br />06617647 - 66220 - 12642101028 <br />JUSTIFICATION <br />The plans call to construct a new soundwall along the property line between the <br />private properties and the City owned lots on the west side of Bristol between 7th & <br />8th Streets, The APWA standard shown on plan shows the height of the wall based <br />upon the top of footing. A revised plan was issued showing the height of wall to be <br />based upon finish elevations which were not shown on the original plan, requiring an <br />extra course of block to be constructed along 257 LF of soundwall. (PCO #06) A <br />prior approval was granted for this work on July 15, 2013. <br />AGREED. COST $ 1,698 <br />2. While potholing utilities for the new 12" and 8" water mains, an AT &T duct bank was <br />encountered in the trench line at two locations. The duct bank is 84" to the bottom, <br />with the top being 36" from the proposed finished surface. These elevations do not <br />permit the new 12" water main to be installed over the top of the duct bank and <br />therefore must be installed under it. Due to the proximity of a Metropolitan Water <br />District 36" water line, a vertical offset must be constructed at each location to <br />enable the installation of the proposed water mains under the AT &T duct bank.(PCO <br />#08) A prior approval was granted for this work on June 18, 2013. <br />AGREED COST $ 56,700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.