My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - MACARTHUR BLVD REHAB
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
02/19/2013
>
23B - PROJ - MACARTHUR BLVD REHAB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2013 2:11:11 PM
Creation date
2/14/2013 2:09:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
2/19/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />CLERK OF COUNCIL USE ONLY: <br />FEBRUARY 19, 2013 <br />TITLE: APPROVED <br />CONTRACT AWARD TO HARDY AND ? As Recommended <br />HARPER, INC., FOR MACARTHUR ? As Amended 5 <br />BOULEVARD REHABILITATION - ? Ordinance on 1 Reading <br />? Ordinance on 2"d Reading <br />BRISTOL STREET TO FLOWER STREET ? Implementing Resolution <br />(PROJECT NO. 136786) ? Set Public Hearing For_ <br />6? iGkL <br />--- <br />CITY MANAG R <br />CONTINUED TO <br />FILE NUMBER <br />RECOMMENDED ACTION <br />1. Award a contract to the lowest responsible bidder, Hardy and Harper, Inc., in accordance <br />with the Base Bid, totaling $911,000, for MacArthur Boulevard Rehabilitation from Bristol <br />Street to Flower Street. <br />2. Approve the Cost Analysis as shown in Exhibit 1 for a total estimated project delivery cost of <br />$1,138,750. <br />DISCUSSION <br />The City's Pavement Management System has identified MacArthur Boulevard from Bristol Street <br />to Flower Street (Exhibit 2) as a high priority for rehabilitation. The pavement has deteriorated <br />due to weather, age, heavy usage, and poor drainage. Portions of the adjacent curb and gutter, <br />driveway approaches, curb ramps, and sidewalks are either missing or in disrepair and require <br />replacement. Improvements include reconstruction of pavement and replacement of damaged <br />concrete curb and gutter, driveway approaches, sidewalk, and construction of new cross gutters. <br />Once completed, these improvements will extend the life of the pavement and enhance the ride <br />quality, surface drainage, and appearance of the street. <br />A Notice Inviting Bids was advertised on January 7, 2013, and January 8, 2013, and bids were <br />opened on January 23, 2013. A summary of the bid invitations mailed, bids received, and bid <br />results are as follows: <br />Contractor Participation Data <br />Santa Ana contractors receiving notices: 12 <br />Contractors requesting bidding documents: 18 <br />Bids received: 4 <br />Bids received from Santa Ana contractors: 1 <br />23B-1
The URL can be used to link to this page
Your browser does not support the video tag.