My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ENGINEERING SRVS FOR DT STRUCTURES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
02/19/2013
>
25C - AGMT - ENGINEERING SRVS FOR DT STRUCTURES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2013 3:20:45 PM
Creation date
2/14/2013 3:07:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25C
Date
2/19/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />AECOM <br />999 W. Town & Country Road. Orange. CA 92868 <br />T 714.567.2501 F 714.567.2441 www.aecom.com <br />February 2, 2013 <br />Mr. Kenny Nguyen <br />City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, California 92702 <br />Dear Kenny, <br />Subject: Incorporation of Security Upgrades to Parking Structures <br />AECOM <br />This letter is AECOM's proposal for services associated with security upgrades at four City of Santa Ana <br />parking structures. The basis of this scope of work is our telephone discussion and knowledge of the project <br />from our previous services on these facilities. <br />We propose to utilize AECOM's On-Call contract with the City of Santa Ana for this work. The contract is <br />titled "On-Call Engineering and Landscape Architecture Services", Contract No. A-2008-216. <br />General Scope of Work Items <br />The scope of work for this proposal is to extract certain improvements from contract documents that were <br />previously prepared for broader improvements to the four parking garages. This proposal does not <br />include seismic analysis or retrofit of any structures, fire sprinklers, parking lot ingress/egress controls <br />(these were previously prepared by others and will be incorporated into the package however), or <br />modifications to the sidewalks or public streets around the parking structures. In addition, ADA related <br />issues are not included with this proposal since the proposed work is assumed to be routine operational <br />or maintenance work and therefore does not meet the threshold of requiring ADA upgrade to other <br />portions of the facilities. <br />The contract documents will be to City of Santa Ana standards and will include plans, specifications, and <br />contract provisions. It is assumed that the City's standard boilerplate contract document will be used as a <br />basis and updated with the project's information to form the final contract documents. This will be <br />performed by AECOM as part of this proposal. <br />Lastly, the scope of work does not include construction administration (CA). That work can be added and <br />our previous estimate will be adequate to cover the work should it be requested by the City. <br />Other assumptions include: <br />Submittal will be 100% draft package and final construction documents. <br />Drawings will be in Autocad. <br />The hourly rates are as listed in AECOM's On-Call contract for 2012 (City contract number A-2008-216) <br />Proiect Specifics - 50 and Spurgeon (Fiesta Marketplace) <br />Services will include extracting contract document items related to the following: <br />• Parking controls for the garage (gates, access controls, and ticket booths). <br />• Electrical upgrades needed to support parking controls. <br />25C-6
The URL can be used to link to this page
Your browser does not support the video tag.