My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ENGINEERING SRVS FOR DT STRUCTURES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
02/19/2013
>
25C - AGMT - ENGINEERING SRVS FOR DT STRUCTURES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2013 3:20:45 PM
Creation date
2/14/2013 3:07:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25C
Date
2/19/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Kenny Nguyen <br />February 2, 2012 <br />Page 2 of 3 <br />• Roll-up grilles and supports (including electrical upgrades to support roll-up grilles). <br />• Structural repairs as specified for the facility in the previous contract documents. <br />• Modify storage area in garage to replace existing enclosure with chain link fencing and gate. <br />• Modify access doors to improve security of door handles and locks - add steel mesh to secure. <br />• Remove Fiesta Marketplace overhead sign. <br />The total cost of the service is $16,750. This cost is based on the following breakdown: <br />Engineering/Mgmt $ 1,200 <br />Architectural Engr $ 0 <br />Electrical Engr $ 2,000 <br />Structural Engr $ 2,200 <br />Mechanical Engr $ 0 <br />Nestor+Gaffney $ 8,500 <br />Cost Estimate $ 1,500 <br />Subconsultant mark-up (10%) $ 850 (10% of Gaffney) <br />AECOM ODC $ 500 <br />Total Cost (this location): $ 16,750 <br />The total cost of the service for Fiesta Marketplace is $16,750. <br />Other Three Parking Garages <br />The scope of work for the parking garages located at Third/Birch, Fifth/Main, and Third/Broadway shall <br />include the items listed below. AECOM's scope of work includes extracting the information needed to <br />prepare a contract bid set that includes the following: <br />• Roll-up grilles for parking garages at Third/Broadway and Third/Birch. <br />• Parking controls (gates, access controls, and ticket booths) for the garages at Third/Birch and <br />Third/Broadway. <br />• Replacement or addition of steel mesh around exterior doors; new egress doors equipped with <br />panic hardware on first story doors at Third/Birch. <br />• Electrical work needed to support the parking controls and roll-up grilles. <br />• Management booth at Fifth/Main (including electrical). <br />• Replace concrete panel on Fifth/Main. <br />• Upgrade security grating on first floor of Third/Broadway parking structure so that first floor is <br />secure and enclosed. <br />AD - ti <br />AECOM <br />25C-7
The URL can be used to link to this page
Your browser does not support the video tag.