My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (5) - 2013
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (5) - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 10:14:57 AM
Creation date
2/27/2013 10:42:57 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY
Contract #
A-2013-021
Agency
PUBLIC WORKS
Council Approval Date
1/22/2013
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-2-2030 <br />ATTACHMENT A <br />• Corridor lane configurations and lane widths; <br />• Existing street and lane geometries, curbs, and medians; <br />• Upcoming improvements to the corridor; <br />• Traffic signs and pavement markings at all PROJECT intersections, <br />approaches to cross streets, and along PROJECT corridor; <br />• Traffic signal control device information, such as type of device, brand and <br />make, condition of equipment. Intersection Photographic Documentation Log <br />shall be required; <br />• Existing signal operation characteristics — signal phasing, cycle lengths, phase <br />sequence alteration, and protective -permissive, etc.; <br />• Existing controller and telemetry/interconnect equipment; <br />• Existing time -referencing setup; <br />• Existing Central Master Equipment; <br />• Existing Field Master Equipment; <br />• Open each controller cabinet and take digital photos of all equipment inside; <br />• Note any deficiencies of traffic control equipment at each intersection; and <br />• Note the maintenance condition or existence of the traffic signal equipment, <br />controllers and synchronization related infrastructure. <br />CONSULTANT shall also investigate factors that are expected to affect signal <br />progression including, but not limited to: intersections with high pedestrian or bicyclist <br />volumes; over -saturated intersections; uneven lane distribution; high volumes of trucks <br />and buses; high -volume un-signalized intersections, including interchanges; parking <br />maneuvers; presence and location of bus stops; differing signal timing patterns among <br />AGENCIES; etc. <br />With the view of assisting, enhancing, and improving the traffic operations along this <br />corridor, CONSULTANT shall identify any deficiencies of the existing traffic signal <br />control and telemetry infrastructure, and geometric layout, and provide <br />recommendations towards simple solutions that may be implemented to correct such <br />deficiencies. <br />CONSULTANT shall prepare a report summarizing the findings of the field review. <br />If deemed necessary by the APM or through request of an AGENCY through the APM, <br />CONSULTANT shall prepare any design construction documents in the form of <br />sketches to full-fledged Plans Specifications and Estimates (PS & E). CONSULTANT <br />shall prepare such plans for use in the construction of the PROJECT per each <br />respective AGENCY's standards. CONSULTANT shall supply such documentation to <br />the APM and the AGENCY owning the affected facility for approval prior to commencing <br />any construction. Construction documents will be used during the course of <br />construction by AGENCY for inspection services. CONSULTANT shall modify <br />documents subject to approved construction completion to owning AGENCY as an As — <br />Built document. Cost for production, reproduction, inspection services, and as — built <br />services are part of the Full Fixed Price of the Contract and/or CTO and no additional <br />compensation shall be allowed, therefore. <br />1.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.