My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (5) - 2013
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (5) - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 10:14:57 AM
Creation date
2/27/2013 10:42:57 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY
Contract #
A-2013-021
Agency
PUBLIC WORKS
Council Approval Date
1/22/2013
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-2-2030 <br />ATTACHMENT A <br />the synchronization timing is working as designed, and complete any necessary <br />adjustments. Monthly driving times will consist of a full 12-hour weekday and a 4-hour <br />Saturday. CONSULTANT shall notify APM 24 hours prior to commencement of driving <br />periods. <br />Deliverables — Task 8: <br />1. 24 months of on -call support and revised signal timing plans and memorandum <br />documenting CONSULTANT recommendations and AGENCY actions <br />2. Electronic versions of all data files and memorandums. <br />Task 9: Project Report <br />At the end of the three (3) year contract period, CONSULTANT shall prepare a Final <br />Report with an executive summary. The report shall provide complete documentation of <br />the project, including, but not limited to, project objectives, project locations, project <br />scope, findings, recommendations, implementation schedule, improvements <br />accomplished, report on the Continued Signal Timing Support per Task 8, and <br />procedures for continuing maintenance, surveillance, and evaluation of the coordinated <br />signal system, work performed, data collected: 'before' and 'after' studies and project <br />benefits achieved in terms of fuel savings, travel time, and other measurable <br />parameters. The report shall document all planned and programmed improvements on <br />the study corridor as well as recommendations for further infrastructure improvements <br />that would likely improve the corridor signal coordination project results. CONSULTANT <br />shall present the final report and results of the project to the Board and city councils as <br />required. The report shall be completed in accordance with the current CTFP <br />Guidelines. <br />The report shall include for each intersection the lane configurations; signal phasing, <br />turning movement data, and cycle lengths for existing and proposed timings for all peak <br />periods. In addition, in a separate binder, all the traffic signal phase sequences, signal <br />timing plans, and pedestrian timings shall be documented. Finally, the report shall <br />provide recommendations with cost and benefit estimates for future improvements to <br />traffic signal infrastructure (signal controllers, vehicle detection, communications, etc.), <br />intersection capacity (appropriate signal phasing, lane geometrics, and alleviation of <br />physical bottlenecks that curtail arterial capacity), and traffic management strategies. <br />These proposed improvements are beyond the scope of this demonstration project but <br />should be useful in determining future enhancements to the corridor. <br />Deliverables — Task 9: <br />1. Draft and Final PROJECT Signal Synchronization Project Report (one electronic <br />master and 15 hardcopies) and Presentations. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.