My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ENVIRONMENTAL SERVICES 301 E JEANETTE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
03/04/2013
>
25C - AGMT - ENVIRONMENTAL SERVICES 301 E JEANETTE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2013 12:24:53 PM
Creation date
2/28/2013 4:40:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25C
Date
3/4/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 City of Santa Ana <br />Updated Proposal for the 301 East Jeanette Lane <br />4a+??az.r Residential Project Mitigated Negative Declaration <br />6.3 COMPLETION OF FINAL ENVIRONMENTAL DOCUMENT <br />RBF will prepare a draft final document for City review and approval. The Final document will consist of the revised Draft <br />text, as necessary to address the comments received on the Draft document. The Final document will include a purpose <br />subsection, reference the review process, comments received, responses and any required edits/updates to the Public <br />Review document. Also included in the final document is the Mitigation Monitoring Program in accordance with Public <br />Resources Code Section 21081,6 (AB 3180). Five copies (5), one (1) camera-ready original, and an electronicfile of the <br />Final Initial Study/(Mitigated) Negative Declaration will be provided to the City, RBF will prepare the N01 and Notice of <br />Determination and will file the notices at the Orange County Recorders Office. This scope of work excludes the required <br />fees for the California Department of Fish and Game (CDFG). <br />7.0 PROJECT COORDINATION AND MEETINGS/HEARINGS <br />7.1 PROJECT COORDINATION <br />Mr. Glenn Lajoie, AICP, and Mr. Alan Ashimine will be responsible for management and supervision of the environmental <br />review as well as consultation with the City. Mr. Lajoie and/or Mr. Ashimine will undertake consultation and coordination of <br />the project and the environmental review for compliance with CEQA requirements. Mr. Lajoie and/or Mr, Ashimine will <br />consult with State and local agencies regarding the environmental documents. This task also covers costs necessary to <br />administer the contract for this effort. <br />7.2 MEETINGS AND HEARINGS <br />Mr. Lajoie and/or Mr. Ashimine will attend all scheduled staff meetings and will represent the Project Team at public <br />hearings and make presentations as necessary. RBF anticipates several meetings as well as conference calls with City <br />Staff throughout the project. Mr. Lajoie and Mr. Ashimine, along with other key Project Team personnel, will be available to <br />attend meetings with affected jurisdictions, agencies, and organizations, as needed to identify issues, assess impacts, and <br />define mitigation. Should the City determine that additional meetings beyond the following listed meetings, below, are <br />necessary, services will be provided under a separate scope of work on a time and materials basis. The estimated costfor <br />additional meetings is approximately $600 per person, <br />• One (1) kick-off meeting with City Staff (Refer to Task 1.0) <br />• Two (2) progress meetings with City Staff <br />• One (1) Planning Commission Study Session <br />• One (1) City Council Study Session <br />• One (1) Planning Commission Hearings <br />JN 132203 0 11 0 February 25, 2013 <br />25C-22
The URL can be used to link to this page
Your browser does not support the video tag.