My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (12) -2002
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (12) -2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 11:21:41 AM
Creation date
3/4/2013 1:13:00 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT
Contract #
A-2002-101A
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/3/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
south section of Centennial Road, near the easterly boundary of the Property. The <br />parking stalls on the Property shall be sized to prevent encroachment of vehicles upon <br />required landscape areas. The aisles for access to and from parking areas shall not be less <br />than twenty -three (23) feet wide in those areas with ninety - degree parking. To prevent <br />students from parking in the teacher /visitor parking area, and to help avoid traffic <br />circulation problems, District shall design and construct a gate at the T- intersection <br />access point from Centennial Road to the teacher /visitor parking area, near the <br />intersection of Centennial Road and Fairview Street on the easterly boundary of the <br />Property. <br />5.2 Modifications to Parking Structure. The Site Plan design calls for a <br />parking structure containing approximately three hundred and thirty -six (336) spaces. <br />District agrees to revise the Site Plan to replace the proposed two story parking structure <br />with a three story parking structure containing an additional one hundred and sixty -seven <br />(167) spaces. <br />5.3 Traffic Signal. Prior to opening of the School, the District shall install a <br />new traffic signal at Fairview Street and Centennial Road, at the easterly entrance to <br />Centennial Park in accordance with City standards. <br />5.4 Intersection Restriping. In coordination with the City, prior to opening <br />of the School, the District shall re -stripe Fairview Street at the intersection of Centennial <br />Road at the easterly entrance to Centennial Park to accommodate all vehicle and <br />pedestrian movements, and to realign the street centerline in accordance with City <br />standards. <br />5.5 NPDES Requirements. District shall comply with all NPDES <br />requirements for the Property as identified in City DP letter dated March 11, 2002. <br />5.6 Fencing. Fencing specified for the area near the north wall of the <br />Performing Arts Center shall be of a material other than chain link reasonably acceptable <br />to the City's Executive Director of Planning and Building, and shall be consistent with <br />the design of the Performing Arts Center building. <br />5.7 R_ eplacement Softball Fields /Restrooms. The District, at its option, shall <br />either construct or pay the City costs for the City to construct replacement softball fields <br />in accordance with City approved plans at a location generally depicted in the revised <br />Centennial Park master plan attached hereto as Exhibit "D ". Within six (6) months of the <br />date hereof, the City shall submit to the District a final site plan of the location and design <br />of the replacement softball fields (and restrooms identified below). If the District opts to <br />pay for the City to do the construction, the City shall be entitled to use the funds in the <br />Escrow Account established pursuant to Section 6.2 of this Lease. These fields shall be <br />on a portion of Centennial Park not within the Premises or subject to the Joint Use <br />Agreement. However, the City agrees to allow District use of these fields for educational <br />and athletic purposes subject to the City's usual usage and scheduling standards. The <br />replacement fields need not be lighted. However, construction costs shall include the <br />costs to install electrical conduit and other infrastructure up to the point of a main pole <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.