Laserfiche WebLink
Aegis ITS, Inc. <br />I Routine Maintenance <br />A. Monthly Service <br />Item # Bid Item Quantity Unit Price (new) Sub-total <br />1 Traffic Signal 284 $ 57.05 $ 16,201.80 <br />2 Pre-timed Flashing Beacon 5 $ 35.70 $ 178.50 <br />Activated Flashing Crosswalk/Beacons <br />3 7 $ 35.70 $ 249.90 <br />4 2500 Lumen Lamp 369 $ 3.67 $ 1,354.97 <br />5 6000 Lumen Lamp 6 $ 4.49 $ 26.93 <br />B. Quarterly Service <br />Item # Bid Item Quantity Unit Price (new) Sub-total <br />6 Closed Circuit Television System 52 $ 66.30 $ 3,447.60 <br />C. Alternate Routine Maintenance - Bi-Monthly Service <br />Item # Bid Item Quantity Unit Price (new) Sub-total <br />la Traffic Signal 284 75.48 $ 21,436.32 <br />2a Pre-timed Flashing Beacon 5 37.74 $ 188.70 <br />3a Activated Flashing Crosswalk/Beacons 7 37.74 $ 264.18 <br />11 Extraordinary Maintenance <br />Item# Title Straighttime Overtime Doubletime <br />7 Superintendent 80.58 113.22 151.98 <br />8 Engineering Technician 80.58 113.22 151.98 <br />9 Laboratory Technician 80.58 113.22 151.98 <br />10 Maintenance Technician - Lead 80.58 113.22 151.98 <br />11 Maintenance Technician 72.42 95.88 136.68 <br />12 Utility Technician - Lead 80.58 113.22 151.98 <br />13 Utility Technician 72.42 95.88 136.68 <br />14 Lead High Voltage St. Light Tech 80.58 113.22 151.98 <br />15 Street Light Technician 72.42 95.88 136.68 <br />16 Service Laborer 67.32 90.78 131.58 <br />C. Labor and Material <br />Material; Contractors cost for the supply plus(+) 15% <br />Item # Bid Item Unit Unit Price <br />17 Install 6' diameter circular loop (1-5 loops) EA $ 306.00 <br />18 Install 6' diameter circular loop (6-30 loops) EA $ 294.53 <br />19 Install 6' diameter circular loop (11-20 loops) EA $ 267.75 <br />20 Install 6' diameter circular loop (over 20 loops) EA $ 267.75 <br />21 Install City furnished NEMA Conflict Monitor EA $ 714.00 <br />22 Install City furnished P44 Cabinet EA $ 1,224.00 <br />23 Install City furnished type 332 Cabinet EA $ 1,224.00 <br />24 Adjust PPB Assembly height EA $ 66.30 <br />25 Insall/Replace complete PPB Assembly EA $ 144.84 <br />26 Replace PPB with ADA PPB EA $ 66.30 <br />27 Replace Ped Head & Construction Module EA $ 382.50 <br />28 Replace Ped Module w/ Countdown Module EA $ 321.30 <br />29 Install/Replace IISNS w/Reflectorized Street Name EA $ 693.60 <br />30 Conduct Signal Cabinet Operational Test EA $ 816.00 <br />31 Conduct Night Survey upon request EA $ 408.00 <br />32 Paint Traffic Signal Cabinet EA $ 326.40 <br />33 Paint Vehicle Head EA $ 62.22 <br />34 Paint Pedestrian Head EA $ 40.80 <br />35 Paint single-globe theme street light pole EA $ 255.00 <br />36 Paint double-globe theme street light pole EA $ 275.40 <br />37 Paint 30 ft. steel street light pole EA $ 367.20 <br />III. Equipment <br />Item # Type of Equipment Cost <br />38 Pick-up Truck $ 25.50 job/trip <br />39 Service Truck $ 43.86 job/trip <br />40 Service Ladder/Truck N/A job/trip <br />41 Boom Ladder/Truck $ 43.86 job/trip <br />42 SO' Height Boom Truck $ 91.80 job/trip <br />43 Crane Truck $ 321.30 job/trip <br />44 Water Truck N/A job/trip <br />45 Dump Truck $ 153.00 job/trip <br />46 Big Concrete Saw N/A job/trip <br />47 Complete Paint Rig $ 510.00 job/trip <br />48 Jack Hammer/Compressor $ 107.10 job/trip <br />49 Trencher and Backhoe $ 510.00 job/trip