Laserfiche WebLink
<br /> <br /> <br /> <br /> Contract Award for Parton Street <br /> Sewer Main Improvements <br /> April 1, 2013 <br /> Page 2 <br /> <br /> <br /> BID RESULTS SUMMARY <br /> <br /> RANK BIDDER'S NAME LOCATION BASE BID <br /> 1 Atlas-Allied, Inc. Anaheim $258,760 <br /> <br /> 2 GRFO, Inc. Moreno Valley $274,170 <br /> 3 SND Construction, Inc. Arcadia $287,070 <br /> 4 Palp, Inc. dba Excel Paving Company Long Beach $323,991 <br /> <br /> 5 G. Hurtado Construction, Inc. Riverside $339,930 <br /> 6 Bali Construction El Monte $341,644 <br /> 7 SRD Engineering, Inc. Anaheim $368,066 <br /> <br /> <br /> A total of 7 bids were received and all were deemed responsive. The bid results and the lowest <br /> responsive bid by Atlas-Allied, Inc., in the amount of $258,760 is significantly lower than the <br /> Engineer's Estimate of $339,500. Therefore staff recommends awarding the contract and <br /> proceeding with construction. <br /> ENVIRONMENTAL IMPACT <br /> <br /> In accordance with the California Environmental Quality Act, the proposed project is exempt from <br /> further review. Categorical Exemption Environmental Review No. 2012-56 has been filed for this <br /> project. <br /> <br /> <br /> FISCAL IMPACT <br /> <br /> A project cost analysis shown in Exhibit 1 determines that the total funds needed to deliver the <br /> project, which includes construction administration, inspection, testing, and contingencies, is <br /> approximately $323,400. Funding is available to cover those costs in the Sewer Services Capital <br /> Project account (No. 05617640-66220), Project No. 126418. <br /> <br /> APPROVED AS TO FUNDS AND ACCOUNTS: <br /> <br /> <br /> <br /> Raul Godinez 11 Francisco Gutierrez <br /> Executive Director' Executive Director <br /> Public Works Agency Finance & Management Services Agency <br /> <br /> RG/TC <br /> Exhibit 1: Cost Analysis <br /> 2: Project Location Map <br /> <br /> 23B-2 <br />