My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING 3 - 2013
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
RBF CONSULTING 3 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:52:13 PM
Creation date
4/29/2013 1:12:24 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF CONSULTING
Contract #
A-2013-014
Agency
PUBLIC WORKS
Council Approval Date
1/22/2013
Expiration Date
12/31/2014
Insurance Exp Date
8/30/2015
Destruction Year
2021
Notes
Amended by A-2013-014-01
Document Relationships
RBF CONSULTING 3A - 2015
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 2 — HYDROLOGY <br />Task 2.1 Hydrology Model Evaluation <br />CivilStorm does not inlcude Orange County Hydrology Methods, therefore, in order to utilize the full hydrodynamic <br />CivilStorm hydraulic model and conform with the County of Orange Hydrology Manual, this will task evaluate <br />hydrology models for inclusion into the CivilStorm hydrodynamic model. RBF, in coordination with the City, will <br />evaluate the following hydrology models for possible inclusion in the master plan: CivilStorm, HEC-WMS, and AES. <br />The models will be evaluated for the following criteria: capability to calculate Orange County Hydrology based on <br />the Orange County Hydrology Manual, ease of use for the City, and integration with the CivilStorm hydrodynamic <br />model. <br />Deliverables: <br />1. Hydrology Model Evaluation Memo <br />Task 2.2 Delineate Existing Watershed Characteristics <br />Using the established Drainage Basins within the existing City of Santa Ana Updated Master Plan of Drainage by <br />Boyle Engineering Corporation, RBF will update boundaries based on field investigations (Task 1.1) and identify <br />modifications for facilities constructed after 1994 (Task 1.4). Boundaries for the drainage areas have been <br />provided by the City and will be used to determine the minimum critical hydrologic concentration points. The <br />points will be used to assist in the development of the watershed model and analysis requirements for the <br />hydraulic design. Watershed maps, depicting the 7 regional drainage area watersheds, will be developed to <br />document the mapping for the proposed hydrologic modeling. The watershed maps will determine the average <br />characteristic parameters associated with the modified or updated watershed subareas that are necessary for the <br />application of hydrologic analysis. We will obtain and review available data for parameter estimation in the <br />precipitation -runoff model including infiltration, vegetation cover, impervious cover (from City provided GIS <br />landuse files), hydrologic soils data, and watershed hydraulic efficiency. <br />Deliverables: <br />1. Seven Watershed Maps 1"=500' scale <br />Task 2.3 Hydrology Analysis <br />RBF will prepare a hydrology analysis for the watershed to quantitatively estimate the "ultimate" land use <br />watershed condition surface runoff flowrates and volumes for the 2-,5-, 10-, 25-, and 100 -year storm return <br />periods based upon full conveyance of the drainage systems for all storm events. The analysis will include both <br />rational method (used for time of concentration calculations) and hydrograph methods (used for peak flow and <br />volume calculations). The hydrology models will be used to develop a link -node model for critical concentration <br />points previously identified in Task 2.2. Flowrates and volumes developed will be limited in minimum tributary <br />drainage area size to the masterplan or primary backbone facility systems only (i.e. flowrates will not be calculated <br />for each individual surface inlet). Hydrology calculations will be completed in accordance with the City hydrologic <br />criteria and the Orange County Hydrology Manual. <br />Deliverables: <br />1. Hydrology Flowrates, Volumes, and Tc in tables for the 2-, 5-, 10-, 25-, and 100 -year storms for use in <br />CivilStorm hydraulics analysis. <br />TASK 3 — HYDRAULIC ANALYSIS <br />Task 3.1 Existing Municipal Storm Drain - Hydraulic Model Preparation <br />RBF will develop a hydraulic model of the existing City backbone storm drain system. The hydraulic analysis will <br />be based upon evaluation of the hydraulic grade line, rather than "normal depth" calculations (used in the 1994 <br />Master Master Plan). Hydraulic grade line (HGL) calculations will be performed utilizing the dynamic hydraulic <br />�`'"' 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.