My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RAILPROS - 2013
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
RAILPROS - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 2:11:36 PM
Creation date
5/16/2013 7:36:50 AM
Metadata
Fields
Template:
Contracts
Company Name
RAILPROS
Contract #
N-2013-038
Agency
PUBLIC WORKS
Expiration Date
12/31/2013
Insurance Exp Date
1/23/2015
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Railroad Engineering Services <br />Fee <br />Tasks will be performed on a time and materials basis, in accordance with the current rates, terms and <br />conditions of the Contract. Tasks will be assigned by Santa Ana and performed by RailPros based on the <br />fee estimate below. <br />P.M. 319A 1A 1009 .3A Mn 40 <br />TASK 1 <br />m <br />d C <br />o <br />U v <br />d C <br />rn <br />E <br />N <br />� <br />V1 <br />N <br />jp <br />O <br />n <br />U <br />Y <br />N <br />Task 1A - RailPros Service and Deliverables <br />Project Management and Administration <br />8 <br />1 <br />6 <br />$751.07 <br />Project Coordination <br />10 <br />2 <br />12 <br />$1,372.59 <br />Response to NOI Comments <br />4 <br />4 <br />1 $500.72 <br />Site Inspection <br />4 <br />4 <br />$500.72 <br />Quiet Zone Si na e <br />2 <br />2 <br />$250.36 <br />QZ Calculations <br />4 <br />4 <br />$500.72 <br />Crossing Inventories <br />8 <br />8 <br />$1,001.43 <br />Draft NOE Document <br />3 <br />3 <br />$375.54 <br />Final NOE and Exhibits <br />8 <br />2 <br />10 <br />$1,12223 <br />Quality Assuran e/Quality Control <br />1 <br />4 <br />5 <br />$934.54 <br />Hours Subtotals <br />1 50 <br />1 4 <br />4 <br />58 <br />Subtotal Task 1A <br />$7,309.91 <br />Other Direct Costs ODCs) <br />Reproduction and Postage <br />1 $200.00 <br />Subtotal ODCs <br />1 $200.00 <br />Task 1B- Contingency <br />Contingency for overrun or additional or unforseen services <br />1 $2,000.00 <br />Subtotal Task 18 <br />1 $2,000.00 <br />TOTAL ESTIMATED FEE 1 $9,509.91 <br />11113.11M <br />Services <br />Task 2 will consist of providing On -Call Engineering Services for Grade Crossings and Traffic Signal <br />support and improvements. The scope of services for this task, or any subtasks thereto, required by the <br />City will be developed and assigned on an "As Needed" basis. The scope and fee for any services to be <br />provided under this task will be included as an addendum to this document. <br />Task 3 will consist of providing On -Call Engineering Services for Quiet Zone Support including the <br />development of additional or supplement quiet zone documentation and coordination. The scope of <br />services for this task, or any subtasks thereto, required by the City will be developed and assigned on an <br />"As Needed" basis. The scope and fee for any services to be provided under this task will be included as <br />an addendum to this document. <br />w Ir <br />t � J <br />
The URL can be used to link to this page
Your browser does not support the video tag.