My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RAILPROS - 2013
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
RAILPROS - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 2:11:36 PM
Creation date
5/16/2013 7:36:50 AM
Metadata
Fields
Template:
Contracts
Company Name
RAILPROS
Contract #
N-2013-038
Agency
PUBLIC WORKS
Expiration Date
12/31/2013
Insurance Exp Date
1/23/2015
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Railroad Engineering Services <br />Mew <br />Task 1A and 113 <br />• No meetings are anticipated <br />Deliverables <br />Task 1A <br />• Response to NOI Comments <br />• Quiet Zone Calculations <br />• Inventory Updates (pre and post construction) <br />• Draft NOE document <br />• Final NOE document with Exhibits <br />Task 16 <br />• No Deliverables are anticipated <br />Assumptions <br />1. Total meeting, coordination and participation hours are per the fee breakdown. <br />2. The City will provide documentation, including As -Built Drawings and any other pertinent <br />information. <br />3. Any Survey, design work or other services not detailed above will not be provided under this <br />task. Other services not defined herein may be provided under a separate task based upon the <br />terms of the Contract and as requested by the City. Services that may be provided under a <br />separate task may include Quiet Zone status updates, assistance with traffic signals or grade <br />crossings, railroad coordination, future quiet zone implementation or other work to be defined <br />under a separate scope. <br />4. Where possible, all documentation and submittals will be provided electronically. <br />5. RailPros personnel will be assigned based on the requirements of the tasks requested by the <br />City. Tasks are assigned by the City on an as- needed basis. Primary engineering services will be <br />performed at RailPros engineering offices. <br />
The URL can be used to link to this page
Your browser does not support the video tag.