My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
05/20/2013
>
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 11:15:57 AM
Creation date
5/20/2013 1:34:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Date
5/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Omnibus Concrete <br />PROJECT CATEGORY: <br />NEIGHBORHOOD IMPROVEMENTS - <br />CURB, GUTTER, SIDEWALK IMPROVEMENTS <br />LOCATION MAP <br />CITYWIDE <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Replacement of defective sidewalk, curb, and gutter, <br />and the installation of wheelchair ramps. <br />PROJECT COSTS <br />Engineering <br />Construction <br />TOTAL <br />SOURCE OF FUNDS <br />Measure M2 Fairshare <br />Gas Tax <br />TOTAL <br />PROJECT NEED: <br />Curbs, gutters, and sidewalks throughout the City <br />have deteriorated and need replacement to reduce <br />potential liability and improve the City's image. <br />FY 13/14 <br />FY 14/15 <br />FY 15/16 <br />FY 16/17 <br />FY 17/19 <br />FY 19/19 <br />FY 19/20 <br />25,900 <br />26,700 <br />23,200 <br />18,500 <br />18,500 <br />18,500 <br />18,500 <br />324,100 <br />323,141 <br />290,316 <br />231,500 <br />231,500 <br />231,500 <br />231,500 <br />350,000 <br />349,841 <br />313,516 <br />250,000 <br />250,000 <br />250,000 <br />250,000 <br />FY 13/14 <br />FY 14/15 <br />FY 15/16 FY 16/17 FY 17/19 FY 19/19 FY 19/20 <br />160,530 <br />59,841 <br />63,516 <br />189,470 <br />290,000 <br />250,000 250,000 250,000 250,000 250,000 <br />350,000 <br />349,841 <br />313,516 250,000 250,000 250,000 250,000 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 15- May -13 <br />- 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.